The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec
🔥 33/100The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec
SPX-089114
, Michigan
- Project ID
- SPX-089114
- Estimated value
- $13.6M
- Square footage
- Not reported
- Opened / announced
- Sep 16, 2024
- Owner
- Department of Veterans Affairs
- General contractor
- DANIELS BUILDING CO INC. RB CONSTRUCTION COMPANY. INDUSTRIAL MAINTENANCE SERVICES INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE CONSTRUCT PRIVATE IN-PATIENT ROOMS AND PRIMARY CLINICS CONSTRUCTION (MINOR). Awarded by Department of Veterans Affairs. Period of performance through 2026-07-31. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE EXPAND PRIMARY CARE PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-02-10. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-09-18.
Key specs
- Award 36C77624C0154
- Awarding agency: Department of Veterans Affairs
- ZIP 48152
- Award 36C77621C0058
- ZIP 49801
- Award 36C77622C0095
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests. Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- medical gas
- elevators
- flooring
- lighting
- fire suppression
- roofing
- concrete
Timeline
Awarded
Sep 16, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal33/100
- Value
- 33/40
- Recency
- 0/35
- News coverage
- 0/25
MI
Exact coordinates for this project haven't been geocoded yet.