The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

🔥 33/100
← All projects
under constructionHealthcare

The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

SPX-089114

, Michigan

Project ID
SPX-089114
Estimated value
$13.6M
Square footage
Not reported
Opened / announced
Sep 16, 2024
Owner
Department of Veterans Affairs
General contractor
DANIELS BUILDING CO INC. RB CONSTRUCTION COMPANY. INDUSTRIAL MAINTENANCE SERVICES INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE CONSTRUCT PRIVATE IN-PATIENT ROOMS AND PRIMARY CLINICS CONSTRUCTION (MINOR). Awarded by Department of Veterans Affairs. Period of performance through 2026-07-31. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE EXPAND PRIMARY CARE PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-02-10. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-09-18.

Key specs

  • Award 36C77624C0154
  • Awarding agency: Department of Veterans Affairs
  • ZIP 48152
  • Award 36C77621C0058
  • ZIP 49801
  • Award 36C77622C0095

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests. Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • medical gas
  • elevators
  • flooring
  • lighting
  • fire suppression
  • roofing
  • concrete

Timeline

  1. Awarded

    Sep 16, 2024 · Federal (SAM.gov / USAspending)

Priority score

Low signal

33/100

Value
33/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

MI

Exact coordinates for this project haven't been geocoded yet.