The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

🔥 33/100
← All projects
completedCommercial

The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

SPX-094055

, Minnesota

Project ID
SPX-094055
Estimated value
$19.0M
Square footage
Not reported
Opened / announced
Sep 12, 2022
Owner
Department of Veterans Affairs
General contractor
GCH CONSTRUCTION COMPANY. MDM CONSTRUCTION LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2024-05-23. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM TRAINING AND ADMINISTRATIVE SUPPORT SPACE CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2025-05-30.

Key specs

  • Award 36C77622C0111
  • Awarding agency: Department of Veterans Affairs
  • ZIP 56303
  • Award 36C77622C0072

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Sep 12, 2022 · Federal (SAM.gov / USAspending)

Priority score

Low signal

33/100

Value
33/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

MN

Exact coordinates for this project haven't been geocoded yet.