Plant 2 To St. Paul Barge Terminal, Approximate Mississippi Mile 837.5 And Begin Dredging/Excavation. Material Shall Be

🔥 27/100
← All projects
completedCommercial

Plant 2 To St. Paul Barge Terminal, Approximate Mississippi Mile 837.5 And Begin Dredging/Excavation. Material Shall Be

SPX-081699

, Minnesota

Project ID
SPX-081699
Estimated value
$182,051
Square footage
Not reported
Opened / announced
Sep 10, 2025
Owner
Department of Defense
General contractor
L S MARINE INC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

PLANT 2 TO ST. PAUL BARGE TERMINAL, APPROXIMATE MISSISSIPPI MILE 837.5 AND BEGIN DREDGING/EXCAVATION. MATERIAL SHALL BE PLACED AT THE SOUTHPORT PLACEMENT SITE 2-836.3-RMP. Awarded by Department of the Army (Department of Defense). Period of performance through 2025-09-25.

Key specs

  • Award W912ES25FA020
  • Awarding agency: Department of the Army
  • ZIP 55101

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Sep 10, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

27/100

Value
24/40
Recency
3/35
News coverage
0/25
📍 Regional location pending

MN

Exact coordinates for this project haven't been geocoded yet.