The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

🔥 35/100
← All projects
completedCommercial

The Contractor Shall Provide All Tools, Equipment, Materials, Labor, Supervision, Personnel, And Shall Do All Things Nec

SPX-093277

, Missouri

Project ID
SPX-093277
Estimated value
$38.2M
Square footage
Not reported
Opened / announced
May 23, 2023
Owner
Department of Veterans Affairs
General contractor
GUARANTEE INTERIORS, INC. AC JV ONE LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-07-09. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE COMPLETION OF THE EHRM INFRASTRUCTURE UPGRADES CONSTRUCTION PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-01-09. THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS, LABOR, SUPERVISION, PERSONNEL, AND SHALL DO ALL THINGS NECESSARY THAT WILL RESULT IN THE CONSTRUCTION OF THE EHRM INFRASTRUCTURE UPGRADES DATA CENTER PROJECT. Awarded by Department of Veterans Affairs. Period of performance through 2026-07-31.

Key specs

  • Award 36C77623C0055
  • Awarding agency: Department of Veterans Affairs
  • ZIP 63125
  • Award 36C77623C0087
  • ZIP 63106
  • Award 36C77625C0054

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only. Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • switchgear
  • fire suppression
  • generators
  • raised flooring

Timeline

  1. Awarded

    May 23, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

35/100

Value
35/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

MO

Exact coordinates for this project haven't been geocoded yet.