Glac 307606 - Replace Swift Current Water Distribution System, Gaoa
🔥 32/100← All projects
under constructionIndustrial
Glac 307606 - Replace Swift Current Water Distribution System, Gaoa
SPX-089409
, Montana
- Project ID
- SPX-089409
- Estimated value
- $9.9M
- Square footage
- Not reported
- Opened / announced
- Sep 9, 2024
- Owner
- Department of the Interior
- General contractor
- BAIRCO CONSTRUCTION INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
GLAC 307606 - REPLACE SWIFT CURRENT WATER DISTRIBUTION SYSTEM, GAOA. Awarded by National Park Service (Department of the Interior). Period of performance through 2026-09-30.
Key specs
- Award 140P2024C0073
- Awarding agency: National Park Service
- ZIP 59411
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
Timeline
Awarded
Sep 9, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal32/100
- Value
- 32/40
- Recency
- 0/35
- News coverage
- 0/25
📍 Regional location pending
MT
Exact coordinates for this project haven't been geocoded yet.