Nc Erfo Np Blri 2024-1(2): The Project Consists Of Stabilizing Damage To The Blue Ridge Parkway Caused By Hurricane Hele

🔥 29/100
← All projects
under constructionCommercial

Nc Erfo Np Blri 2024-1(2): The Project Consists Of Stabilizing Damage To The Blue Ridge Parkway Caused By Hurricane Hele

SPX-086681

, North Carolina

Project ID
SPX-086681
Estimated value
$2.3M
Square footage
Not reported
Opened / announced
Dec 23, 2024
Owner
Department of Transportation
General contractor
CENTRAL SOUTHERN CONSTRUCTION CORP.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2026-10-31.

Key specs

  • Award 693C7325F00021N
  • Awarding agency: Federal Highway Administration
  • ZIP 28646

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Dec 23, 2024 · Federal (SAM.gov / USAspending)

Priority score

Low signal

29/100

Value
29/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

NC

Exact coordinates for this project haven't been geocoded yet.