Project Nc Erfo Np Blri 2024-1(1): The Project Consists Of Repairing Damage To The Blue Ridge Parkway Caused By Hurrican
🔥 33/100Project Nc Erfo Np Blri 2024-1(1): The Project Consists Of Repairing Damage To The Blue Ridge Parkway Caused By Hurrican
SPX-086671
, North Carolina
- Project ID
- SPX-086671
- Estimated value
- $14.7M
- Square footage
- Not reported
- Opened / announced
- Dec 26, 2024
- Owner
- Department of Transportation
- General contractor
- CENTRAL SOUTHERN CONSTRUCTION CORP.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2027-12-31.
Key specs
- Award 693C7325F00023N
- Awarding agency: Federal Highway Administration
- ZIP 28805
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Dec 26, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal33/100
- Value
- 33/40
- Recency
- 0/35
- News coverage
- 0/25
NC
Exact coordinates for this project haven't been geocoded yet.