Project Nc Erfo Np Blri 2024-1(3): The Project Consists Of Repairing Damage To The Blue Ridge Parkway Caused By Hurrican
🔥 31/100Project Nc Erfo Np Blri 2024-1(3): The Project Consists Of Repairing Damage To The Blue Ridge Parkway Caused By Hurrican
SPX-086618
, North Carolina
- Project ID
- SPX-086618
- Estimated value
- $6.8M
- Square footage
- Not reported
- Opened / announced
- Dec 31, 2024
- Owner
- Department of Transportation
- General contractor
- CENTRAL SOUTHERN CONSTRUCTION CORP.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2027-11-30.
Key specs
- Award 693C7325F00025N
- Awarding agency: Federal Highway Administration
- ZIP 28711
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Dec 31, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal31/100
- Value
- 31/40
- Recency
- 0/35
- News coverage
- 0/25
NC
Exact coordinates for this project haven't been geocoded yet.