Project Nc Erfo Fs Nfnc811 2020-1(1): The Project Consists Of The Repair Of A Fill Slope Failure On Tuni Gap Road (Rte
🔥 28/100Project Nc Erfo Fs Nfnc811 2020-1(1): The Project Consists Of The Repair Of A Fill Slope Failure On Tuni Gap Road (Rte
SPX-084492
, North Carolina
- Project ID
- SPX-084492
- Estimated value
- $662,370
- Square footage
- Not reported
- Opened / announced
- Apr 25, 2025
- Owner
- Department of Transportation
- General contractor
- CENTRAL SOUTHERN CONSTRUCTION CORP.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2027-02-28.
Key specs
- Award 693C7325F00055N
- Awarding agency: Federal Highway Administration
- ZIP 28902
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Apr 25, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal28/100
- Value
- 27/40
- Recency
- 1/35
- News coverage
- 0/25
NC
Exact coordinates for this project haven't been geocoded yet.