Provide All Necessary Design, Engineering, Equipment, Labor, And Material For Removal Of Existing Overhead And Urd Prima

🔥 34/100
← All projects
under constructionCommercial

Provide All Necessary Design, Engineering, Equipment, Labor, And Material For Removal Of Existing Overhead And Urd Prima

SPX-079429

, North Carolina

Project ID
SPX-079429
Estimated value
$573,767
Square footage
Not reported
Opened / announced
Jan 29, 2026
Owner
Department of Defense
General contractor
SANDHILLS UTILITY SERVICES, LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

PROVIDE ALL NECESSARY DESIGN, ENGINEERING, EQUIPMENT, LABOR, AND MATERIAL FOR REMOVAL OF EXISTING OVERHEAD AND URD PRIMARY IN CONFLICT OF THE RANGE, INSTALL NEW 3 PHASE PRIMARYTRANSFORMER AND URD FACILITIES. Awarded by Department of the Army (Department of Defense). Period of performance through 2027-01-29.

Key specs

  • Award W9124726FA010
  • Awarding agency: Department of the Army
  • ZIP 28310

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Jan 29, 2026 · Federal (SAM.gov / USAspending)

Priority score

Low signal

34/100

Value
26/40
Recency
8/35
News coverage
0/25
📍 Regional location pending

NC

Exact coordinates for this project haven't been geocoded yet.