Adas Piezometer Installation At B. Everett Jordan Dam.

🔥 26/100
← All projects
under constructionCommercial

Adas Piezometer Installation At B. Everett Jordan Dam.

SPX-083296

, North Carolina

Project ID
SPX-083296
Estimated value
$185,584
Square footage
Not reported
Opened / announced
Jul 3, 2025
Owner
Department of Defense
General contractor
BRUTE LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

ADAS PIEZOMETER INSTALLATION AT B. EVERETT JORDAN DAM. Awarded by Department of the Army (Department of Defense). Period of performance through 2027-03-21.

Key specs

  • Award W912PM25P0059
  • Awarding agency: Department of the Army
  • ZIP 27559

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Jul 3, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

26/100

Value
24/40
Recency
2/35
News coverage
0/25
📍 Regional location pending

NC

Exact coordinates for this project haven't been geocoded yet.