Contract For The Griswold Valve Removal Project At Boston Center Nashua, Nh. Project Is To Shut Down And Drain The Boil
🔥 40/100Contract For The Griswold Valve Removal Project At Boston Center Nashua, Nh. Project Is To Shut Down And Drain The Boil
SPX-078222
, New Hampshire
- Project ID
- SPX-078222
- Estimated value
- $90,603
- Square footage
- Not reported
- Opened / announced
- Apr 29, 2026
- Owner
- Department of Transportation
- General contractor
- CORNERSTONE CONSTRUCTION SERVICES, LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
CONTRACT FOR THE GRISWOLD VALVE REMOVAL PROJECT AT BOSTON CENTER NASHUA, NH. PROJECT IS TO SHUT DOWN AND DRAIN THE BOILER PLANT IN ORDER TO REMOVE TWO FLOW-RESTRICTING GRISWOLD VALVES, INSTALL FLOW MONITORING CAPABILITY, REFILL AND RESTART THE BOILE. Awarded by Federal Aviation Administration (Department of Transportation). Period of performance through 2026-09-14.
Key specs
- Award 697DCK26C00126
- Awarding agency: Federal Aviation Administration
- ZIP 03062
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Apr 29, 2026 · Federal (SAM.gov / USAspending)
Priority score
Watch40/100
- Value
- 23/40
- Recency
- 17/35
- News coverage
- 0/25
NH
Exact coordinates for this project haven't been geocoded yet.