Contract For The Griswold Valve Removal Project At Boston Center Nashua, Nh. Project Is To Shut Down And Drain The Boil

🔥 40/100
← All projects
under constructionCommercial

Contract For The Griswold Valve Removal Project At Boston Center Nashua, Nh. Project Is To Shut Down And Drain The Boil

SPX-078222

, New Hampshire

Project ID
SPX-078222
Estimated value
$90,603
Square footage
Not reported
Opened / announced
Apr 29, 2026
Owner
Department of Transportation
General contractor
CORNERSTONE CONSTRUCTION SERVICES, LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

CONTRACT FOR THE GRISWOLD VALVE REMOVAL PROJECT AT BOSTON CENTER NASHUA, NH. PROJECT IS TO SHUT DOWN AND DRAIN THE BOILER PLANT IN ORDER TO REMOVE TWO FLOW-RESTRICTING GRISWOLD VALVES, INSTALL FLOW MONITORING CAPABILITY, REFILL AND RESTART THE BOILE. Awarded by Federal Aviation Administration (Department of Transportation). Period of performance through 2026-09-14.

Key specs

  • Award 697DCK26C00126
  • Awarding agency: Federal Aviation Administration
  • ZIP 03062

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Apr 29, 2026 · Federal (SAM.gov / USAspending)