The Intent Of The Project Is To Repair The Laminated Shingle Roofing Systems On Building 1950, To Repair The Existing Co
🔥 32/100The Intent Of The Project Is To Repair The Laminated Shingle Roofing Systems On Building 1950, To Repair The Existing Co
SPX-082016
, Oklahoma
- Project ID
- SPX-082016
- Estimated value
- $3.5M
- Square footage
- Not reported
- Opened / announced
- Aug 28, 2025
- Owner
- Department of Defense
- General contractor
- TRUMBLE CONSTRUCTION LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE INTENT OF THE PROJECT IS TO REPAIR THE LAMINATED SHINGLE ROOFING SYSTEMS ON BUILDING 1950, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM CONSISTING OF ASPHALT SHINGLE AND TPO ON BUILDING 1948, TO REPAIR THE EXISTING COMPOSITE ROOFING SYSTEM. Awarded by Department of the Army (Department of Defense). Period of performance through 2027-11-25.
Key specs
- Award W912BV25FA036
- Awarding agency: Department of the Army
- ZIP 73503
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Aug 28, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal32/100
- Value
- 30/40
- Recency
- 2/35
- News coverage
- 0/25
OK
Exact coordinates for this project haven't been geocoded yet.