← All Georgia projects
planningIndustrial

OpenAI Project Camellia Data Center

Rincon, Effingham County, Georgia

Estimated value
$20B
Square footage
4,400,000 SF
Opened / announced
Owner
OpenAI
General contractor
Architect
Brands mentioned
Georgia Power

Project overview

$20B+ data center campus at Savannah Gateway Industrial Hub near Savannah; up to ~4.4M SF across four buildings in DRI concept; phases 2028-2032; Georgia Power 3.2 GW agreement.

Key specs

  • $20B+ campus
  • Up to ~4.4M SF, four buildings
  • Phases 2028-2032
  • 3.2 GW Georgia Power agreement

Still open for manufacturers

Announced/in DRI review — multi-phase buildout through 2032 means prolonged specification and procurement windows for mission-critical products.

Manufacturer watch list

  • data center cooling/mechanical
  • electrical distribution and switchgear
  • generators/UPS
  • roofing
  • precast concrete
  • fencing and security
  • fire suppression

Sources

  • AJC coverage
  • REBusinessOnline