Removal Of The Existing Corrugated Metal Pipe Culvert And Construction Of A New Structural Plate Arch Culvert With Cast

🔥 28/100
← All projects
under constructionCommercial

Removal Of The Existing Corrugated Metal Pipe Culvert And Construction Of A New Structural Plate Arch Culvert With Cast

SPX-082166

, Oregon

Project ID
SPX-082166
Estimated value
$485,115
Square footage
Not reported
Opened / announced
Aug 22, 2025
Owner
Department of Agriculture
General contractor
BILLETER ROADS & FORESTRY LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

REMOVAL OF THE EXISTING CORRUGATED METAL PIPE CULVERT AND CONSTRUCTION OF A NEW STRUCTURAL PLATE ARCH CULVERT WITH CAST IN PLACE CONCRETE FOOTINGS. REHABILITATING OF THE STREAM WITH AN AQUATIC ORGANISM PASSAGE AND RESURFACING THE EXISTING ASPHALT ROA. Awarded by Forest Service (Department of Agriculture). Period of performance through 2026-10-31.

Key specs

  • Award 1240BH25F0035
  • Awarding agency: Forest Service
  • ZIP 97492

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Aug 22, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

28/100

Value
26/40
Recency
2/35
News coverage
0/25
📍 Regional location pending

OR

Exact coordinates for this project haven't been geocoded yet.