Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is T

🔥 34/100
← All projects
completedCommercial

Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is T

SPX-093383

, Oregon

Project ID
SPX-093383
Estimated value
$19.9M
Square footage
Not reported
Opened / announced
Apr 17, 2023
Owner
Department of Transportation
General contractor
STELLAR J CORP
Architect
Not reported
Brands mentioned
None in public seed

Project overview

OR DOT 18(1), OR58: COAST FORK WILLAMETTE RIVER TO LOWER SALT CR BRIDGES. THE PRIMARY OBJECTIVE OF THE THIS PROJECT IS TO SEISMICALLY RETROFIT 3 BRIDGES ON OR-58 BETWEEN US-97 AND I-5. THE SCOPE OF WORK CONSISTS OF: STRUCTURE REPAIR, STRUCTURE SEISMI. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2025-12-05.

Key specs

  • Award 69056723C000016
  • Awarding agency: Federal Highway Administration
  • ZIP 97492

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Apr 17, 2023 · Federal (SAM.gov / USAspending)

Priority score

Low signal

34/100

Value
34/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

OR

Exact coordinates for this project haven't been geocoded yet.