Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is T
🔥 34/100Or Dot 18(1), Or58: Coast Fork Willamette River To Lower Salt Cr Bridges. The Primary Objective Of The This Project Is T
SPX-093383
, Oregon
- Project ID
- SPX-093383
- Estimated value
- $19.9M
- Square footage
- Not reported
- Opened / announced
- Apr 17, 2023
- Owner
- Department of Transportation
- General contractor
- STELLAR J CORP
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
OR DOT 18(1), OR58: COAST FORK WILLAMETTE RIVER TO LOWER SALT CR BRIDGES. THE PRIMARY OBJECTIVE OF THE THIS PROJECT IS TO SEISMICALLY RETROFIT 3 BRIDGES ON OR-58 BETWEEN US-97 AND I-5. THE SCOPE OF WORK CONSISTS OF: STRUCTURE REPAIR, STRUCTURE SEISMI. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2025-12-05.
Key specs
- Award 69056723C000016
- Awarding agency: Federal Highway Administration
- ZIP 97492
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Apr 17, 2023 · Federal (SAM.gov / USAspending)
Priority score
Low signal34/100
- Value
- 34/40
- Recency
- 0/35
- News coverage
- 0/25
OR
Exact coordinates for this project haven't been geocoded yet.