The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber O
🔥 30/100The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber O
SPX-091169
, Oregon
- Project ID
- SPX-091169
- Estimated value
- $3.3M
- Square footage
- Not reported
- Opened / announced
- Jun 26, 2024
- Owner
- Department of Transportation
- General contractor
- BURTON CONSTRUCTION, INC.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R. Awarded by Federal Aviation Administration (Department of Transportation). Period of performance through 2026-07-31.
Key specs
- Award 697DCK24C00251
- Awarding agency: Federal Aviation Administration
- ZIP 97603
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- roofing
- hvac
- doors and hardware
- concrete
- lighting
Timeline
Awarded
Jun 26, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal30/100
- Value
- 30/40
- Recency
- 0/35
- News coverage
- 0/25
OR
Exact coordinates for this project haven't been geocoded yet.