The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber O

🔥 30/100
← All projects
under constructionAviation

The Work Covered Under This Specification Includes The Installation Of A New Instrument Landing System (Ils) And Fiber O

SPX-091169

, Oregon

Project ID
SPX-091169
Estimated value
$3.3M
Square footage
Not reported
Opened / announced
Jun 26, 2024
Owner
Department of Transportation
General contractor
BURTON CONSTRUCTION, INC.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE WORK COVERED UNDER THIS SPECIFICATION INCLUDES THE INSTALLATION OF A NEW INSTRUMENT LANDING SYSTEM (ILS) AND FIBER OPTIC TRANSMISSION SYSTEM (FOTS) AND THE REPLACEMENT OF AN EXISTING ILS AND RUNWAY VISUAL RANGE (RVR) AT THE CRATER LAKE, KLAMATH R. Awarded by Federal Aviation Administration (Department of Transportation). Period of performance through 2026-07-31.

Key specs

  • Award 697DCK24C00251
  • Awarding agency: Federal Aviation Administration
  • ZIP 97603

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • roofing
  • hvac
  • doors and hardware
  • concrete
  • lighting

Timeline

  1. Awarded

    Jun 26, 2024 · Federal (SAM.gov / USAspending)

Priority score

Low signal

30/100

Value
30/40
Recency
0/35
News coverage
0/25
📍 Regional location pending

OR

Exact coordinates for this project haven't been geocoded yet.