The Fort Randall Dam Spillway Bridge Abutment Repair And Bearing Replacement Consists Of Removing And Replacing Damaged
🔥 30/100← All projects
under constructionCommercial
The Fort Randall Dam Spillway Bridge Abutment Repair And Bearing Replacement Consists Of Removing And Replacing Damaged
SPX-081105
, South Dakota
- Project ID
- SPX-081105
- Estimated value
- $681,644
- Square footage
- Not reported
- Opened / announced
- Sep 24, 2025
- Owner
- Department of Defense
- General contractor
- LORR CONSTRUCTION, INC.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE FORT RANDALL DAM SPILLWAY BRIDGE ABUTMENT REPAIR AND BEARING REPLACEMENT CONSISTS OF REMOVING AND REPLACING DAMAGED CONCRETE ON THE ABUTMENT, AND REPLACE BRIDGE BEARINGS AT THE ABUTMENT. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-12-17.
Key specs
- Award W9128F25CA053
- Awarding agency: Department of the Army
- ZIP 57367
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Sep 24, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal30/100
- Value
- 27/40
- Recency
- 3/35
- News coverage
- 0/25
📍 Regional location pending
SD
Exact coordinates for this project haven't been geocoded yet.