The Fort Randall Dam Spillway Bridge Abutment Repair And Bearing Replacement Consists Of Removing And Replacing Damaged

🔥 30/100
← All projects
under constructionCommercial

The Fort Randall Dam Spillway Bridge Abutment Repair And Bearing Replacement Consists Of Removing And Replacing Damaged

SPX-081105

, South Dakota

Project ID
SPX-081105
Estimated value
$681,644
Square footage
Not reported
Opened / announced
Sep 24, 2025
Owner
Department of Defense
General contractor
LORR CONSTRUCTION, INC.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE FORT RANDALL DAM SPILLWAY BRIDGE ABUTMENT REPAIR AND BEARING REPLACEMENT CONSISTS OF REMOVING AND REPLACING DAMAGED CONCRETE ON THE ABUTMENT, AND REPLACE BRIDGE BEARINGS AT THE ABUTMENT. Awarded by Department of the Army (Department of Defense). Period of performance through 2026-12-17.

Key specs

  • Award W9128F25CA053
  • Awarding agency: Department of the Army
  • ZIP 57367

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Sep 24, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

30/100

Value
27/40
Recency
3/35
News coverage
0/25
📍 Regional location pending

SD

Exact coordinates for this project haven't been geocoded yet.