Replace The Astf Cooling Tower Structure, Fans, Spray Piping, And Other Supporting Systems Down To The Concrete Basin

🔥 36/100
← All projects
completedCommercial

Replace The Astf Cooling Tower Structure, Fans, Spray Piping, And Other Supporting Systems Down To The Concrete Basin

SPX-080215

, Tennessee

Project ID
SPX-080215
Estimated value
$8.3M
Square footage
Not reported
Opened / announced
Nov 3, 2025
Owner
Department of Defense. Department of Veterans Affairs
General contractor
HEALTHEON, INC. BWIS GTG JV LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

REPLACE THE ASTF COOLING TOWER STRUCTURE, FANS, SPRAY PIPING, AND OTHER SUPPORTING SYSTEMS DOWN TO THE CONCRETE BASIN. Awarded by Department of the Air Force (Department of Defense). Period of performance through 2026-04-14. COOLING TOWER. Awarded by Department of Veterans Affairs. Period of performance through 2026-10-02.

Key specs

  • Award FA910126FB002
  • Awarding agency: Department of the Air Force
  • ZIP 37389
  • Award 36C24925C0064
  • Awarding agency: Department of Veterans Affairs
  • ZIP 38104

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only. Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Nov 3, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

36/100

Value
32/40
Recency
4/35
News coverage
0/25
📍 Regional location pending

TN

Exact coordinates for this project haven't been geocoded yet.