Project Np Natr 5570-463P: The Project Consists Of The Installation Of Architectural Steel Post And Mesh Barrier System
🔥 37/100Project Np Natr 5570-463P: The Project Consists Of The Installation Of Architectural Steel Post And Mesh Barrier System
SPX-079895
, Tennessee
- Project ID
- SPX-079895
- Estimated value
- $5.8M
- Square footage
- Not reported
- Opened / announced
- Dec 9, 2025
- Owner
- Department of Transportation
- General contractor
- MC3 SOLUTIONS LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT NP NATR 5570-463P: THE PROJECT CONSISTS OF THE INSTALLATION OF ARCHITECTURAL STEEL POST AND MESH BARRIER SYSTEM ON THE NATCHEZ TRACE DOUBLE ARCH BRIDGE. THE WORK ON THE BRIDGE INCLUDES THE REMOVAL OF THE EXISTING TEMPORARY FENCE, REPAIR OF T. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2027-09-24.
Key specs
- Award 693C7326C000002
- Awarding agency: Federal Highway Administration
- ZIP 37064
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Dec 9, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal37/100
- Value
- 31/40
- Recency
- 6/35
- News coverage
- 0/25
TN
Exact coordinates for this project haven't been geocoded yet.