3588 Highway 114 Hwy
🔥 22/100- Project ID
- SPX-117186
- Estimated value
- $60,000
- Square footage
- 2,331 SF
- Opened / announced
- Aug 1, 2024
- Owner
- CHICK-FIL-A INC
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Fort Worth commercial permit PB24-11561: Drive-thru window to be replace with a Tormax Door (automatic sliding door). 3588 HIGHWAY 114 HWY. Fort Worth commercial permit CG24-00138: Drive-thru modification with canopies. Existing single lane order meal delivery (OMD) canopy to be removed and replaced with a dual-lane OMD canopy. Existing face to face (F2F) canopy to be removed, relocated and replaced as a dual lane Face to Face (F2F) canopy. Transformer relocation and relocation of the grease traps. Curb work and striping proposed. Relocation of landscape and trees as necessary. Delineators are proposed and the western ingress along the western property line is to be changed to a right turn only entrance. Parking count reduction. Drive-thru window to be replace with a Tormax Door (automatic sliding door). 3588 HIGHWAY 114 HWY. Fort Worth commercial permit PB24-11656: Drive-thru modification with canopies. Existing single lane order meal delivery (OMD) canopy to be removed and replaced with a dual-lane OMD canopy.. 3588 HIGHWAY 114 HWY. Fort Worth commercial permit PB24-11662: Transformer relocation and relocation of the grease traps. Curb work and striping proposed. Relocation of landscape and trees as necessary. Delineators are proposed and the western ingress along the western property line is to be changed to a right turn only entrance. Parking count reduction.. 3588 HIGHWAY 114 HWY. Fort Worth commercial permit PB24-16865: Drive-thru modification with canopies. Installation of a new dual lane Face to Face (F2F) canopy. 3588 HIGHWAY 114 HWY.
Key specs
- Remodel
- 3588 HIGHWAY 114 HWY
- Permit PB24-11561
- NA
- Permit CG24-00138
- New
- Permit PB24-11656
- Permit PB24-11662
- Addition
- Permit PB24-16865
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Aug 1, 2024 · Prior research
Priority score
Low signal22/100
- Value
- 22/40
- Recency
- 0/35
- News coverage
- 0/25