15120 N Beach St

🔥 49/100
← All projects
permittingCommercial

15120 N Beach St

SPX-099273

Fort Worth, Tarrant County, Texas

Project ID
SPX-099273
Estimated value
$59.6M
Square footage
9,518 SF
Opened / announced
Mar 26, 2026
Owner
TERRY GRAZING ASSN. BA Leasing BSC LLC. TERRY GRAZING ASSN
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Fort Worth commercial permit PB26-04339: The proposed development will include a new wastewater treatment plant designed to treat wastewater from the manufacturing facility before sending effluent wastewater into the City of Fort Worth sanitary sewer system. This development will consist of a new treatment building, tank yard, outdoor control area, and associated concrete drives and yard piping.. 15120 N BEACH ST. Fort Worth commercial permit CG26-00030: Proposed wastewater treatment plant (WWTP) for the Bell MV-75 Advanced Manufacturing Facility. 15120 N BEACH ST. Fort Worth commercial permit CG26-00070: The proposed project consists of the early grading for initial site preparation activities, including clearing, grubbing, and grading, as well as erosion and sediment control measures necessary to support future construction. Final grading and full site development will be permitted separately.. 15120 N BEACH ST. Fort Worth commercial permit PB26-04342: The proposed development will include a new wastewater treatment plant designed to treat wastewater from the manufacturing facility before sending effluent wastewater into the City of Fort Worth sanitary sewer system. This accessory permit applies only to the tank yard.. 15120 N BEACH ST. Fort Worth commercial permit PB26-04376: The proposed development will include a new wastewater treatment plant designed to treat wastewater from the manufacturing facility before sending effluent wastewater into the City of Fort Worth sanitary sewer system. This accessory permit applies only to the outdoor control area.. 15120 N BEACH ST. Fort Worth commercial permit PB26-04380: The proposed development will include a new wastewater treatment plant designed to treat wastewater from the manufacturing facility before sending effluent wastewater into the City of Fort Worth sanitary sewer system. This accessory permit applies only to the ramp.. 15120 N BEACH ST.

Key specs

  • New
  • 15120 N BEACH ST
  • Permit PB26-04339
  • NA
  • Permit CG26-00030
  • Permit CG26-00070
  • Permit PB26-04342
  • Permit PB26-04376
  • Permit PB26-04380

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete
  • fire suppression

Timeline

  1. Permit issued

    Mar 26, 2026 · Prior research

Priority score

Watch

49/100

Value
36/40
Recency
13/35
News coverage
0/25