1804 Northeast Loop 820 Fwy

🔥 29/100
← All projects
permittingIndustrial

1804 Northeast Loop 820 Fwy

SPX-116988

Fort Worth, Tarrant County, Texas

Project ID
SPX-116988
Estimated value
$2.5M
Square footage
14,138 SF
Opened / announced
Aug 6, 2024
Owner
BOWEN & ASSOC LLC
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Fort Worth commercial permit PB24-11897: The project proposes a phased building addition construction. The proposed building 1 phase addition consists of a 14,117 SF in size warehouse and contains 4' and 2' dock height doors.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-11898: The project proposes a phased building addition construction. Phase 2 consists of demolishing an existing warehouse and proposing a new warehouse addition. The proposed building 2 phase addition consists of a 26,166 SF in size warehouse.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-16440: Install temporary fencing around job site / NO CONSTRUCTION TRAILER PERMITTED ON SITE // SEPARATE PERMIT IS REQUIRED FOR TRAILER PERMIT FOR FENCE ONLY. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-17032: Job site trailer for supervision of new construction on adjacent lot.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-17117: Demolition to make ready for new addition. No new construction included.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB25-03568: SHELVING INSTALL. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB25-03591: SHELVING RACK INSTALL. 1804 NORTHEAST LOOP 820 FWY.

Key specs

  • Addition
  • 1804 NORTHEAST LOOP 820 FWY
  • Permit PB24-11897
  • Permit PB24-11898
  • New
  • Permit PB24-16440
  • Permit PB24-17032
  • Remodel
  • Permit PB24-17117
  • Permit PB25-03568
  • Permit PB25-03591

Still open for manufacturers

Active commercial building permit. Early product/spec window.

Manufacturer watch list

  • roofing
  • hvac
  • dock equipment
  • concrete
  • lighting
  • fire suppression

Timeline

  1. Permit issued

    Aug 6, 2024 · Prior research

Priority score

Low signal

29/100

Value
29/40
Recency
0/35
News coverage
0/25