1804 Northeast Loop 820 Fwy
🔥 29/1001804 Northeast Loop 820 Fwy
SPX-116988
Fort Worth, Tarrant County, Texas
- Project ID
- SPX-116988
- Estimated value
- $2.5M
- Square footage
- 14,138 SF
- Opened / announced
- Aug 6, 2024
- Owner
- BOWEN & ASSOC LLC
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Fort Worth commercial permit PB24-11897: The project proposes a phased building addition construction. The proposed building 1 phase addition consists of a 14,117 SF in size warehouse and contains 4' and 2' dock height doors.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-11898: The project proposes a phased building addition construction. Phase 2 consists of demolishing an existing warehouse and proposing a new warehouse addition. The proposed building 2 phase addition consists of a 26,166 SF in size warehouse.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-16440: Install temporary fencing around job site / NO CONSTRUCTION TRAILER PERMITTED ON SITE // SEPARATE PERMIT IS REQUIRED FOR TRAILER PERMIT FOR FENCE ONLY. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-17032: Job site trailer for supervision of new construction on adjacent lot.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB24-17117: Demolition to make ready for new addition. No new construction included.. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB25-03568: SHELVING INSTALL. 1804 NORTHEAST LOOP 820 FWY. Fort Worth commercial permit PB25-03591: SHELVING RACK INSTALL. 1804 NORTHEAST LOOP 820 FWY.
Key specs
- Addition
- 1804 NORTHEAST LOOP 820 FWY
- Permit PB24-11897
- Permit PB24-11898
- New
- Permit PB24-16440
- Permit PB24-17032
- Remodel
- Permit PB24-17117
- Permit PB25-03568
- Permit PB25-03591
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- roofing
- hvac
- dock equipment
- concrete
- lighting
- fire suppression
Timeline
Permit issued
Aug 6, 2024 · Prior research
Priority score
Low signal29/100
- Value
- 29/40
- Recency
- 0/35
- News coverage
- 0/25