600 E Hurst Blvd
🔥 32/100- Project ID
- SPX-102036
- Estimated value
- $1.5M
- Square footage
- Not reported
- Opened / announced
- Nov 3, 2025
- Owner
- BELL HELICOPTER INC
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Fort Worth commercial permit PB25-15333: Section A&B: Third party to modify select MEP items > Remove existing roof > Check roof deck joints to see if sealed or unsealed. If unsealed and greater than 1" in width, cover joints with strip of vapor barrirer membrane > Adhere 1/8" per foot fully tapered insulation to the concrete roof deck (start with A panel at 1.0" thickness) > Adhere 1/4" per foot polyiso crickets where applicable > Adhere DensDeck Prime StormX board to insulation > Adhere Johns Manville 115-mil Fleeceback TPO to coverboard Section C&D: Third party to install interior protection > Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay one (1) layer of 3.5" polyiso insulation > loose lay 1/2" per foot polyiso crickets where applicable > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard Section E: Third party to install interior protection > third party to modify select MEP items > Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay 1/8" per foot fully tapered insulation on vapor barrier (start with C panel at 2.0" thickness) > Loose lay 1/4" per foot polyiso crickets where applicable > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard Air Traffic Control Tower: Remove existing roof > Loose lay 1/2" DEXcell FA roof board on steel deck > Self-adhere JM Vapor Barrier SA to gypsum board > loose lay two (2) layers of 2.2" polyiso insulation > Mechanically gang fasten 5/8" DEXCell FA VSH board through lower layers to steel deck > Adhere Johns Manville 135-mil Fleeceback TPO to coverboard. 600 E HURST BLVD.
Key specs
- Remodel
- 600 E HURST BLVD
- Permit PB25-15333
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
- fire suppression
Timeline
Permit issued
Nov 3, 2025 · Prior research
Priority score
Low signal32/100
- Value
- 28/40
- Recency
- 4/35
- News coverage