A Shoreline Bulkhead Supporting A Sidewalk Has Suffered Erosion And Caused A Vertical Separation Of 4 Inches. The Unstab

🔥 24/100
← All projects
completedCommercial

A Shoreline Bulkhead Supporting A Sidewalk Has Suffered Erosion And Caused A Vertical Separation Of 4 Inches. The Unstab

SPX-081329

, Texas

Project ID
SPX-081329
Estimated value
$37,500
Square footage
Not reported
Opened / announced
Sep 20, 2025
Owner
Department of Defense
General contractor
RYMAR CONSTRUCTION, INC.
Architect
Not reported
Brands mentioned
None in public seed

Project overview

A SHORELINE BULKHEAD SUPPORTING A SIDEWALK HAS SUFFERED EROSION AND CAUSED A VERTICAL SEPARATION OF 4 INCHES. THE UNSTABLE BULKHEAD NEEDS STABILIZATION, AND SIDEWALK NEEDS REPAIR TO RETURN IT TO ADA COMPLIANCE. IAW STATEMENT OF WORK (SOW). Awarded by Department of the Air Force (Department of Defense). Period of performance through 2025-11-19.

Key specs

  • Award FA303025P0026
  • Awarding agency: Department of the Air Force
  • ZIP 76908

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Sep 20, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

24/100

Value
21/40
Recency
3/35
News coverage
0/25
📍 Regional location pending

TX

Exact coordinates for this project haven't been geocoded yet.