Services To Clean And Flush The Stormwater Infrastructure At The George Washington Memorial Parkway (Gwmp) North And Sou
🔥 27/100Services To Clean And Flush The Stormwater Infrastructure At The George Washington Memorial Parkway (Gwmp) North And Sou
SPX-089662
, Virginia
- Project ID
- SPX-089662
- Estimated value
- $913,018
- Square footage
- Not reported
- Opened / announced
- Sep 2, 2024
- Owner
- Department of the Interior
- General contractor
- MELTECH CORPORATION, INC.
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
SERVICES TO CLEAN AND FLUSH THE STORMWATER INFRASTRUCTURE AT THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) NORTH AND SOUTH CULVERTS. REPLACE DAMAGED CULVERT DROP INLET GRATES AS NECESSARY, AND MAPPING OF NORTH AND SOUTH UNDERGROUND CULVERT SYSTEM. Awarded by Departmental Offices (Department of the Interior). Period of performance through 2025-08-08.
Key specs
- Award 140D0424F1106
- Awarding agency: Departmental Offices
- ZIP 22202
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Sep 2, 2024 · Federal (SAM.gov / USAspending)
Priority score
Low signal27/100
- Value
- 27/40
- Recency
- 0/35
- News coverage
- 0/25
VA
Exact coordinates for this project haven't been geocoded yet.