Design-Build (D-B) Contract For The Mount Vernon Trail, Np-Gwmp Mvt(6) - The Proposed Project Consists Of The Replacemen
🔥 30/100Design-Build (D-B) Contract For The Mount Vernon Trail, Np-Gwmp Mvt(6) - The Proposed Project Consists Of The Replacemen
SPX-095341
, Virginia
- Project ID
- SPX-095341
- Estimated value
- $3.1M
- Square footage
- Not reported
- Opened / announced
- Jun 1, 2020
- Owner
- Department of Transportation
- General contractor
- PUYENPA SERVICES, LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
DESIGN-BUILD (D-B) CONTRACT FOR THE MOUNT VERNON TRAIL, NP-GWMP MVT(6) - THE PROPOSED PROJECT CONSISTS OF THE REPLACEMENT OF THE MOUNT VERNON TRAIL BRIDGE #12 AND REALIGNMENT OF THE BRIDGE APPROACHES. THE NEW BRIDGE WILL BE LOCATED APPROXIMATELY 50 F. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2023-03-20.
Key specs
- Award 693C7320C000019
- Awarding agency: Federal Highway Administration
- ZIP 22003
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Jun 1, 2020 · Federal (SAM.gov / USAspending)
Priority score
Low signal30/100
- Value
- 30/40
- Recency
- 0/35
- News coverage
- 0/25
VA
Exact coordinates for this project haven't been geocoded yet.