Project Va St Tfhrc 50(5): The Project Includes Excavating The Existing Test Lanes, Constructing Underground Concrete Wa
🔥 31/100Project Va St Tfhrc 50(5): The Project Includes Excavating The Existing Test Lanes, Constructing Underground Concrete Wa
SPX-094036
, Virginia
- Project ID
- SPX-094036
- Estimated value
- $4.6M
- Square footage
- Not reported
- Opened / announced
- Sep 14, 2022
- Owner
- Department of Transportation
- General contractor
- FORT MYER CONSTRUCTION CORP
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
PROJECT VA ST TFHRC 50(5): THE PROJECT INCLUDES EXCAVATING THE EXISTING TEST LANES, CONSTRUCTING UNDERGROUND CONCRETE WALLS, UNDERDRAIN AND STORM DRAIN SYSTEMS, SANITARY SEWER LINE, WATERLINE SYSTEM, ELECTRICAL CONDUIT SYSTEM, DRAINAGE IMPROVEMENT,. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2024-07-18.
Key specs
- Award 693C7322C000018
- Awarding agency: Federal Highway Administration
- ZIP 22101
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Sep 14, 2022 · Federal (SAM.gov / USAspending)
Priority score
Low signal31/100
- Value
- 31/40
- Recency
- 0/35
- News coverage
- 0/25
VA
Exact coordinates for this project haven't been geocoded yet.