Act 250 application 7R1403

🔥 0/100
← All projects
permittingOffice

Act 250 application 7R1403

SPX-162776

Irasburg, Irasburg County, Vermont

Project ID
SPX-162776
Estimated value
Not reported
Square footage
Not reported
Opened / announced
Not reported
Owner
Not reported
General contractor
Not reported
Architect
Not reported
Brands mentioned
None in public seed

Project overview

Vermont Act 250 application 7R1403 (Minor, Irasburg): The Black River Crossing has been determined to be at risk due to existing pipeline exposure and for potential additional exposure due to live bed scour conditions. There is also evidence of lateral bank migration at the Project site with resultant toe scour and under-cutting along the near-vertical northern bank. The purpose of the pipeline protection project at the Black River Crossing is to provide a stable layer of protective cover within the pipeline working corridor and provide bank stabilization to reduce risk of pipeline exposure and potential future pipeline damage exacerbated by ongoing geomorphic fluvial processes at the project site. Lateral bank migration, live-bed scour, and presence of large woody material within the Black River have increased the risk of pipeline exposure in the river channel, which poses risks to pipeline integrity. There are no buildings or permanent roads proposed as part of this pipeline protection project..

Key specs

  • Minor
  • 07
  • Application 7R1403

Still open for manufacturers

Active Act 250 land-use review. Early product/spec window.

Manufacturer watch list

  • glazing
  • hvac
  • elevators
  • lighting
  • flooring
  • fire suppression

Priority score

Low signal

0/100

Value
0/40
Recency
0/35
News coverage
0/25