CityPlace (Burlington Square) North Building
🔥 38/100CityPlace (Burlington Square) North Building
SPX-140920
Burlington, Chittenden County, Vermont
- Project ID
- SPX-140920
- Estimated value
- $125M
- Square footage
- Not reported
- Opened / announced
- Apr 28, 2025
- Owner
- David C Farrington, Jr/ CityPlace Partners, LLC /. Omega Electric Construction
- General contractor
- Not reported
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
Burlington VT commercial permit CBP-25-260 (CR - Com/Resident): <p style="box-sizing: border-box; margin: 0px 0px 10px;"><span style="color: rgb(19, 21, 23); font-family: Barlow, Arial, sans-serif; font-size: 14px; font-style: normal; font-variant-caps: normal; font-weight: 400; letter-spacing: normal; orphans: 2; text-align: start; text-indent: 0px; text-transform: none; widows: 2; word-spacing: 0px; white-space: normal; background-color: rgb(247, 249, 250); text-decoration-thickness: initial; text-decoration-style: initial; text-decoration-color: initial; float: none; display: inline !important; box-sizing: border-box;">North Building of Burlington Square project (formerly CityPlace North Building) to contain ±160 room Cambria hotel, ±320 apartments, ±5 retail spaces, ±400 parking spaces including subgrade parking.</span> </p>. 75 Cherry Street. Burlington VT commercial permit CPP-26-35 (CR - Com/Resident): <p style="box-sizing: border-box; margin: 0px 0px 10px;">Furnish and install all plumbing work on attached IFC prints. Includes the following systems, waste/vent, domestic hot, cold, and recirc water, storm, storm overflow, condensate, plumbing fixtures, and natural gas.</p><p style="box-sizing: border-box; margin: 0px 0px 10px;"><br style="box-sizing: border-box;"></p><p style="box-sizing: border-box; margin: 0px 0px 10px;">Central water entrance, meters, and natural gas infrastructure. Parking garage includes oil water separator and pump stations.</p><p style="box-sizing: border-box; margin: 0px 0px 10px;"><br style="box-sizing: border-box;"></p><p style="box-sizing: border-box; margin: 0px 0px 10px;">West wing includes the hotel with waste/vent stacks and a central laundry, mechanical, and cooking space. Central booster pumps and domestic hot water tanks supply the hote guest rooms. Hotel includes 2 x bar areas, a grease interceptor, and full commercial kitchen.</p><p style="box-sizing: border-box; margin: 0px 0px 10px;"><br style="box-sizing: border-box;"></p><p style="box-sizing: border-box; margin: 0px 0px 10px;">North wing includes apartments with decentralized domestic hot water (individual electric hot water tanks, mixing valves, and expansion tanks).</p><p style="box-sizing: border-box; margin: 0px 0px 10px;"><br style="box-sizing: border-box;"></p><p style="box-sizing: border-box; margin: 0px 0px 10px;">West Wing includes apartments as referenced above and 3 x floors of student housing with decentralized domestic hot water equipment. </p><p style="box-sizing: border-box; margin: 0px 0px 10px;">Gas piping is not included in this Plumbing Permit. See attached note.</p>. 75 Cherry Street. Burlington VT commercial permit CEP-26-153 (CR - Com/Resident): Complete electrical system for City Place North. Includes parking garage, Hotel, Residential apartments, Student housing and Retail. 130-140 Bank Street. Burlington VT commercial permit CMP-26-129 (CR - Com/Resident): Furnish and install HVAC equipment for hotel, apartment, student housing and support spaces per the attached mechanical plans. Hotel HVAC includes a Daikin VRV system that serves the hotel common and ameneties areas. Hotel rooms include individual EPHOCA window based heat pump units. Natural gas piping from building entrance to domestic hot water heaters and dryers. Dryer exhaust and intake ducted through louver. Apartment and student housing systems served by Daikin VRV system for common spaces and concealed EPHOCA heat pumps systems for unit heating/cooling. Condensate piping for each unit. Common area ventilation air provided by centralized ERVs. Stairwells and parking garage areas served by exhasut fans. . 75 Cherry Street.
Key specs
- CR - Com/Resident
- 75 Cherry Street
- Permit CBP-25-260
- Permit CPP-26-35
- 130-140 Bank Street
- Permit CEP-26-153
- Permit CMP-26-129
Still open for manufacturers
Active commercial building permit. Early product/spec window.
Manufacturer watch list
- hvac
- elevators
- flooring
- plumbing fixtures
- lighting
- ff&e
Timeline
Permit issued
Apr 28, 2025 · Prior research
Priority score
Low signal38/100
- Value
- 37/40
- Recency
- 1/35
- News coverage
- 0/25