Wa Nps Mora 13(7), Rehabilitate Stevens Canyon Road, Mp 5.0 To 14.0 The Work Consists Of Grading, Stone Masonry, Walls,
🔥 35/100Wa Nps Mora 13(7), Rehabilitate Stevens Canyon Road, Mp 5.0 To 14.0 The Work Consists Of Grading, Stone Masonry, Walls,
SPX-094343
, Washington
- Project ID
- SPX-094343
- Estimated value
- $36.7M
- Square footage
- Not reported
- Opened / announced
- May 26, 2022
- Owner
- Department of Transportation
- General contractor
- TUCCI & SONS LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
WA NPS MORA 13(7), REHABILITATE STEVENS CANYON ROAD, MP 5.0 TO 14.0 THE WORK CONSISTS OF GRADING, STONE MASONRY, WALLS, PAVED WATERWAY REPAIR, PAVING, DRAINAGE, SIGNING, STRIPING, WATERPROOF MEMBRANE, CONCRETE GUTTER REPAIR AND OTHER MINOR WORK ITEM. Awarded by Federal Highway Administration (Department of Transportation). Period of performance through 2024-08-13.
Key specs
- Award 69056722C000014
- Awarding agency: Federal Highway Administration
- ZIP 98361
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
May 26, 2022 · Federal (SAM.gov / USAspending)
Priority score
Low signal35/100
- Value
- 35/40
- Recency
- 0/35
- News coverage
- 0/25
WA
Exact coordinates for this project haven't been geocoded yet.