Project Will Remove And Dispose Of Existing Oily Wastewater Treatment System (Owts) At Facility 705 (Dry Dock 5). Demoli

🔥 34/100
← All projects
under constructionCommercial

Project Will Remove And Dispose Of Existing Oily Wastewater Treatment System (Owts) At Facility 705 (Dry Dock 5). Demoli

SPX-084123

, Washington

Project ID
SPX-084123
Estimated value
$14.3M
Square footage
Not reported
Opened / announced
May 15, 2025
Owner
Department of Defense
General contractor
BRISTOL PRIME CONTRACTORS, LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

PROJECT WILL REMOVE AND DISPOSE OF EXISTING OILY WASTEWATER TREATMENT SYSTEM (OWTS) AT FACILITY 705 (DRY DOCK 5). DEMOLITION AND DISPOSAL WILL INCLUDE FOUR ASSOCIATED WATER STORAGE TANKS TO INCLUDE TWO 40,000 GALLON AND TWO 20,000-GALLON TANKS. Awarded by Department of the Navy (Department of Defense). Period of performance through 2026-08-25.

Key specs

  • Award N4425525F0061
  • Awarding agency: Department of the Navy
  • ZIP 98314

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    May 15, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

34/100

Value
33/40
Recency
1/35
News coverage
0/25
📍 Regional location pending

WA

Exact coordinates for this project haven't been geocoded yet.