Re-Establish Existing Drainage Flow Through Laydown Yard By Removing Existing East Side Fencing, Excavating Ditch Line,

🔥 29/100
← All projects
completedCommercial

Re-Establish Existing Drainage Flow Through Laydown Yard By Removing Existing East Side Fencing, Excavating Ditch Line,

SPX-079941

, Washington

Project ID
SPX-079941
Estimated value
$141,921
Square footage
Not reported
Opened / announced
Dec 3, 2025
Owner
Department of Defense
General contractor
PORT MADISON CONSTRUCTION CORPORATION
Architect
Not reported
Brands mentioned
None in public seed

Project overview

RE-ESTABLISH EXISTING DRAINAGE FLOW THROUGH LAYDOWN YARD BY REMOVING EXISTING EAST SIDE FENCING, EXCAVATING DITCH LINE, CLEANING OUT AND RELEVELING CONCRETE CULVERT, INCLUDING NECESSARY REPAIRS AND PLACING TIMBER ALONG EAST SIDE WITH SILT FENCING. Awarded by Department of the Navy (Department of Defense). Period of performance through 2026-02-05.

Key specs

  • Award N4425526F0015
  • Awarding agency: Department of the Navy
  • ZIP 98315

Still open for manufacturers

Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    Dec 3, 2025 · Federal (SAM.gov / USAspending)

Priority score

Low signal

29/100

Value
24/40
Recency
5/35
News coverage
0/25
📍 Regional location pending

WA

Exact coordinates for this project haven't been geocoded yet.