The Contractor Is To Mobilize The Primary Plant To Ld 6 Lower Aux Chamber, Approximate Mississippi Mile 714.2 And Begin
🔥 21/100The Contractor Is To Mobilize The Primary Plant To Ld 6 Lower Aux Chamber, Approximate Mississippi Mile 714.2 And Begin
SPX-082473
, Wisconsin
- Project ID
- SPX-082473
- Estimated value
- $13,742
- Square footage
- Not reported
- Opened / announced
- Aug 8, 2025
- Owner
- Department of Defense
- General contractor
- L S MARINE INC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE CONTRACTOR IS TO MOBILIZE THE PRIMARY PLANT TO LD 6 LOWER AUX CHAMBER, APPROXIMATE MISSISSIPPI MILE 714.2 AND BEGIN DREDGING/EXCAVATION. MATERIAL SHALL BE PLACED AT THE TREMPEALEAU PLACEMENT SITE 7-714.1-LWP. Awarded by Department of the Army (Department of Defense). Period of performance through 2025-08-11.
Key specs
- Award W912ES25FA009
- Awarding agency: Department of the Army
- ZIP 54661
Still open for manufacturers
Completed federal contract (period of performance has ended). Not an active spec window -- useful for GC/agency relationship history and competitor-win tracking only.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
Aug 8, 2025 · Federal (SAM.gov / USAspending)
Priority score
Low signal21/100
- Value
- 19/40
- Recency
- 2/35
- News coverage
- 0/25
WI
Exact coordinates for this project haven't been geocoded yet.