The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles To

🔥 45/100
← All projects
under constructionCommercial

The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles To

SPX-077941

, West Virginia

Project ID
SPX-077941
Estimated value
$285,031
Square footage
Not reported
Opened / announced
May 18, 2026
Owner
Department of Agriculture
General contractor
VARNER CONSTRUCTION LLC
Architect
Not reported
Brands mentioned
None in public seed

Project overview

THE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR19 FROM 0.354 MILES TO 3.748 MILES. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, LEAD OFF DITCHES, GRAD. Awarded by Forest Service (Department of Agriculture). Period of performance through 2026-09-30.

Key specs

  • Award 12363N26P4013
  • Awarding agency: Forest Service
  • ZIP 26241

Still open for manufacturers

Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.

Manufacturer watch list

  • hvac
  • roofing
  • lighting
  • concrete

Timeline

  1. Awarded

    May 18, 2026 · Federal (SAM.gov / USAspending)

Priority score

Watch

45/100

Value
25/40
Recency
20/35
News coverage
0/25
📍 Regional location pending

WV

Exact coordinates for this project haven't been geocoded yet.