The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles To
🔥 45/100The Purpose Of This Contract Is To Fix Drainage Problem Areas Due To The2023 May Flood Event On Fr19 From 0.354 Miles To
SPX-077941
, West Virginia
- Project ID
- SPX-077941
- Estimated value
- $285,031
- Square footage
- Not reported
- Opened / announced
- May 18, 2026
- Owner
- Department of Agriculture
- General contractor
- VARNER CONSTRUCTION LLC
- Architect
- Not reported
- Brands mentioned
- None in public seed
Project overview
THE PURPOSE OF THIS CONTRACT IS TO FIX DRAINAGE PROBLEM AREAS DUE TO THE2023 MAY FLOOD EVENT ON FR19 FROM 0.354 MILES TO 3.748 MILES. THE PROJECT SHALL CONSIST OF REMOVING CULVERT, INSTALL NEW CULVERTS, CONSTRUCT SPEC DITCHES, LEAD OFF DITCHES, GRAD. Awarded by Forest Service (Department of Agriculture). Period of performance through 2026-09-30.
Key specs
- Award 12363N26P4013
- Awarding agency: Forest Service
- ZIP 26241
Still open for manufacturers
Awarded federal construction contract, in progress. Construction-documents phase may still be open for product substitution requests.
Manufacturer watch list
- hvac
- roofing
- lighting
- concrete
Timeline
Awarded
May 18, 2026 · Federal (SAM.gov / USAspending)
Priority score
Watch45/100
- Value
- 25/40
- Recency
- 20/35
- News coverage
- 0/25
WV
Exact coordinates for this project haven't been geocoded yet.