MICRON ID1-Project Triton-B141 Probe MEP
A discovered project. No specification document has been read yet, so no manufacturer can be named.
Executive brief
(MICRON ID1 B141 - PROBE MEP) (C1888867) **Project management Joe Bruce** Permit for the Mechanical, Electrical and Plumbing systems for B141 Probe Building. All penetration through fire and/or smoke rated walls, ceilings and floor assemblies to comply with 2018 IBC Section 714 and 717 using approved methods to maintain the fire resistance rating. Full building plan review has not been completed and is required to be completed under separate permits for occupancy. Work may proceed at the owner’s risk, any non-compliant items identified upon subsequent plan approval must be corrected before continuing further work. Mechanical Commissioning report shall be submitted to Mechanical Supervisor for final mechanical approval. **TJ** Lighting commissioning shall be submitted to the electrical inspector for final lighting approval. **MDH** Associated permits: BLD23-03427 footing and foundation; B
Scope has not been read from a specification yet
This is a discovered project. No division-by-division breakdown exists until a specification document is published and read.
No specification document has been published for this project
This is a discovered project rather than a bid record. A manufacturer cannot be named without a document behind it.
What you can act on today
No documents held for this project
This record came from search-grounded discovery rather than a bid portal. See the activity feed for the sources behind it.