← All projects
planningTrade

NIST Boulder Building 42 Cooling Tower Capacity Upgrade

Boulder, Boulder County, Colorado
SPX-12004194
The read
Opened / announced
Apr 22, 2020

Executive brief

Federal sources sought 1333ND-20-NB196-20-01757. NIST Boulder Building 42 Cooling Tower Capacity Upgrade. Response deadline 2020-05-06.

Record summary

Data as of .

Location:
Boulder, Colorado
Status:
planning
Opened or announced:
2020-04-22
Documents held:
2
Specification positions:
2
  • As of 2026-11-03, SpecIndex records this project in Boulder, Colorado.
  • As of 2026-11-03, SpecIndex lists the status of this project as planning.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2020-04-22.
  • As of 2026-11-03, SpecIndex holds 2 documents for this project.
  • As of 2026-11-03, SpecIndex holds 2 specification positions for this project, across 1 CSI division, 1 section and 1 page.

Specification positions, by location in the documents

DivisionSectionPage
2301782337
2301782337

Manufacturer names and quotations are part of the signed-in record.

Other projects in Colorado

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.