← All projects
Commercial

Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377)

Newington, Connecticut
SPX-12033442
The read
Opened / announced
Dec 4, 2024

Executive brief

Federal solicitation 36C77624B0015_1. Z2DA--689A4-22-700 EHRM Infrastructure, Newington CONSTRUCTION SOLICITATION (VA-24-00028377). Response deadline 2025-02-04.

Record summary

Data as of .

Location:
Newington, Connecticut
Status:
Bid closed
Opened or announced:
2024-12-04
Bid deadline:
2025-02-04 (passed)
Documents held:
49
Specification positions:
14
  • As of 2026-11-03, SpecIndex records this project in Newington, Connecticut.
  • As of 2026-11-03, the bid deadline for this project (2025-02-04) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2024-12-04.
  • As of 2026-11-03, SpecIndex holds 49 documents for this project.
  • As of 2026-11-03, SpecIndex holds 14 specification positions for this project, across 8 CSI divisions, 10 sections and 13 pages.

Specification positions, by location in the documents

DivisionSectionPage
0801 33 234
0801 33 2320
0909 05 1680
1201 33 23131
07Thermal and Moisture Protection876
08Openings4
08Openings9
09Finishes61
12Furnishings130
23Heating, Ventilating, and Air Conditioning251
23Heating, Ventilating, and Air Conditioning258
25Integrated Automation445
27Communications663
28Electronic Safety and Security790

Manufacturer names and quotations are part of the signed-in record.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.