← All projects
planningTrade

BIL-Funded Chiller Replacement at ST Louis Tower

Bridgeton, St. Louis County, Missouri
SPX-12011343
The read
Opened / announced
Mar 9, 2023

Executive brief

Federal sources sought Chiller_replacement_STL_Tower. BIL-Funded Chiller Replacement at ST Louis Tower. Response deadline 2023-03-22.

Record summary

Data as of .

Location:
Bridgeton, Missouri
Status:
planning
Opened or announced:
2023-03-09
Documents held:
2
Specification positions:
6
  • As of 2026-11-03, SpecIndex records this project in Bridgeton, Missouri.
  • As of 2026-11-03, SpecIndex lists the status of this project as planning.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2023-03-09.
  • As of 2026-11-03, SpecIndex holds 2 documents for this project.
  • As of 2026-11-03, SpecIndex holds 6 specification positions for this project, across 2 CSI divisions, 5 sections and 5 pages.

Specification positions, by location in the documents

DivisionSectionPage
2323 07 00202
2323 21 13203
2323 21 13203
2603 30 00235
23Heating, Ventilating, and Air Conditioning112
26Electrical234

Manufacturer names and quotations are part of the signed-in record.

Other projects in Missouri

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.