← All projects
Trade

GAOA 1BF Beaver Creek Cabin and Little Bear Cabin Roof Replacement

Livingston, Park County, Montana
SPX-12018362
The read
Opened / announced
Jun 28, 2024

Executive brief

Federal solicitation 1240LU24Q0041. GAOA 1BF Beaver Creek Cabin and Little Bear Cabin Roof Replacement. Response deadline 2024-07-22.

Record summary

Data as of .

Location:
Livingston, Montana
Status:
Bid closed
Opened or announced:
2024-06-28
Bid deadline:
2024-07-22 (passed)
Documents held:
6
Specification positions:
3
  • As of 2026-11-03, SpecIndex records this project in Livingston, Montana.
  • As of 2026-11-03, the bid deadline for this project (2024-07-22) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2024-06-28.
  • As of 2026-11-03, SpecIndex holds 6 documents for this project.
  • As of 2026-11-03, SpecIndex holds 3 specification positions for this project, across 1 CSI division, 2 sections and 2 pages.

Specification positions, by location in the documents

DivisionSectionPage
070731298
070731298
07Thermal and Moisture Protection2

Manufacturer names and quotations are part of the signed-in record.

Other projects in Montana

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.