← All projects
Commercial

Z1DA--608-23-133, Third Floor Lab Construction

Manchester, Hillsborough County, New Hampshire
SPX-12035709
The read
Opened / announced
Aug 7, 2024

Executive brief

Federal presolicitation 36C24124B0052. Z1DA--608-23-133, Third Floor Lab Construction. Response deadline 2024-08-23.

Record summary

Data as of .

Location:
Manchester, New Hampshire
Status:
Bid closed
Opened or announced:
2024-08-07
Bid deadline:
2024-08-23 (passed)
Documents held:
31
Specification positions:
11
  • As of 2026-11-03, SpecIndex records this project in Manchester, New Hampshire.
  • As of 2026-11-03, the bid deadline for this project (2024-08-23) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2024-08-07.
  • As of 2026-11-03, SpecIndex holds 31 documents for this project.
  • As of 2026-11-03, SpecIndex holds 11 specification positions for this project, across 7 CSI divisions, 9 sections and 9 pages.

Specification positions, by location in the documents

DivisionSectionPage
0707 42 001
0701 45 299
2222 11 00103
07Thermal and Moisture Protection1
07Thermal and Moisture Protection732
08Openings1
08Openings788
09Finishes998
11Equipment1125
12Furnishings1131
14Conveying Equipment1195

Manufacturer names and quotations are part of the signed-in record.

Other projects in New Hampshire

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.