← All projects
Commercial

S112--NRM | 562-21-708 Correct Power Deficiencies - EEPG III (CON) (VA-25-00073838)

Erie, Erie County, Pennsylvania
SPX-12002301
The read
Opened / announced
May 30, 2025

Executive brief

Federal presolicitation 36C24425R0093. S112--NRM | 562-21-708 Correct Power Deficiencies - EEPG III (CON) (VA-25-00073838). Response deadline 2025-07-15.

Record summary

Data as of .

Location:
Erie, Pennsylvania
Status:
Bid closed
Opened or announced:
2025-05-30
Bid deadline:
2025-07-15 (passed)
Documents held:
27
Specification positions:
1
  • As of 2026-11-03, SpecIndex records this project in Erie, Pennsylvania.
  • As of 2026-11-03, the bid deadline for this project (2025-07-15) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2025-05-30.
  • As of 2026-11-03, SpecIndex holds 27 documents for this project.
  • As of 2026-11-03, SpecIndex holds 1 specification position for this project, across 1 CSI division, 1 section and 1 page.

Specification positions, by location in the documents

DivisionSectionPage
0701 33 23291

Manufacturer names and quotations are part of the signed-in record.

Other projects in Pennsylvania

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.