← All projects
Trade

Bow River WC and Brush Creek WC Siding Replacement

Saratoga, Carbon County, Wyoming
SPX-12030946
The read
Opened / announced
Jul 21, 2021

Executive brief

Federal combined synopsis/solicitation 1240LT21Q0300. Bow River WC and Brush Creek WC Siding Replacement. Response deadline 2021-08-09.

Record summary

Data as of .

Location:
Saratoga, Wyoming
Status:
Bid closed
Opened or announced:
2021-07-21
Bid deadline:
2021-08-09 (passed)
Documents held:
3
Specification positions:
1
  • As of 2026-11-03, SpecIndex records this project in Saratoga, Wyoming.
  • As of 2026-11-03, the bid deadline for this project (2021-08-09) has passed.
  • As of 2026-11-03, SpecIndex records this project as opened or announced on 2021-07-21.
  • As of 2026-11-03, SpecIndex holds 3 documents for this project.
  • As of 2026-11-03, SpecIndex holds 1 specification position for this project, across 1 CSI division, 1 section and 1 page.

Specification positions, by location in the documents

DivisionSectionPage
07Thermal and Moisture Protection1

Manufacturer names and quotations are part of the signed-in record.

Other projects in Wyoming

Nearest first: same county, then same division, then same project type.

Sources

Every fact on this page is drawn from a public record. These are the records.

From the Spec Desk

Data stories from the SpecIndex index, free in full.