Alaska · Division 03
Concrete projects in Alaska · page 3
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Alaska projects, 145 need this division and 3 are still in planning or permitting.
As of 2026-11-03, 145 of the 300 highest-scored Alaska projects in the SpecIndex index need concrete, and 3 of those are still in planning or permitting.
Search the full index →Showing 101–145 of 145 · page 3 of 3
- Repair Fuel Facilities At Eielson Afb, Alaskacompleted
· $1M-$10M
- Replace Curb Stop Valvesunder construction
· Under $1M
- Replace Ssalr With Malsr And Install Papi Modifications On Runway 12 -King Salmon (Akn) Alaskacompleted
· $1M-$10M
- Sitka National Cemetery Fca Construction Projectcompleted
· $1M-$10M
- The Contractor Shall Furnish All Design, Plant, Labor, Equipment, Supplies, Materials, Appliances, Transportation, And Pcompleted
· $1M-$10M
- 1.Shungnak, Ak Jcn:50356 2.Emmonak, Ak Jcn:18026049 3.Nikolai, Ak Jcn:19005058 4.Mountain Village, Ak Jcn:700749 5.Ncompleted
· $1M-$10M
- Ak Anchorage T 2016(1), Connecting Anchorage Trail Improvements Replacing Walking Bridge And Trail Improvements.completed
· $1M-$10M
- Ak Fws Kna 74525(1), Swan Lake Road Projectcompleted
· $1M-$10M
- Ak-Kenai Nwr-Boardwalks Phase Iiiunder construction
· $1M-$10M
- Ak Nps Katm 10(4), Rehabilitate Valley Of 10,000 Smokes Road Phase Iv. This Project Consists Of Culvert Replacement, Gracompleted
· $1M-$10M
- Ak Selawik Nwr Storage Facilityunder construction
· $1M-$10M
- Award For Lps Apscompleted
· $1M-$10M
- Bibe Perform Cyclic Maint On Q642 & Q643completed
· Under $1M
- Bka Heavy Equipment Shopcompleted
· $1M-$10M
- Demo Existing Rcag Towers & Associated Bldgs And Replace With New Rcag Towers & Associated Bldgs In Gulkana, Ak In Accorcompleted
· $1M-$10M
- Ftg205B Repair Tank #420 And Construct Pumphouse Upgrades And Fillstand.completed
· $1M-$10M
- Ftg268 Fire Station Repair-Fort Greely, Alaskacompleted
· $1M-$10M
- Gaoa Kenai Nwr Moose Research Center Fencecompleted
· $1M-$10M
- Gaoa - Kenai Nwr Russian River Stairscompleted
· $1M-$10M
- Hi-Kilauea Point-Slope Stabilizationcompleted
· $1M-$10M
- Jbr040 Camp Denali Modernization Building 49000completed
· $1M-$10M
- Palmer Creek Bridges And Aopcompleted
· $1M-$10M
- Pn11532846 Replace Lower Base Main Transformer, Ketchikan, Alaskacompleted
· $1M-$10M
- Sba # Is1748552556H Firm-Fixed Price (Ffp) Construction For Redstone Arsenal South Campus Trailer Relocationcompleted
· Under $1M
- Sba # Ks1750717009Q Firm-Fixed Price (Ffp) Construction For Redstone Arsenal North Campus Tedac Fowler Gate Barrier Upgcompleted
· Under $1M
- Sba # Ph1755725096J Firm-Fixed Price (Ffp) Construction For Campus Wide Improvements At Redstone Arsenal North Campus Icompleted
· $1M-$10M
- Sisters Island He Shop - Faa Direct Ops O&Acompleted
· $1M-$10M
- Snowden Administration Building Facade &nbs...deadline not recorded
- Ak-Div Of Engineering-Float Plane Dockcompleted
· Under $1M
- Ak-Kenai Nwr-Mystery Creek Aop Constructcompleted
· $1M-$10M
- C116730 - Central Utility Plant (Cup) Boiler Repairscompleted
· $1M-$10M
- Case Mountain Road Maintenance Project Under Matoc For Alt/Repair Construction Services For The Department Of Interior completed
· Under $1M
- Gaoa Kenai Nwr Hq Renovationcompleted
· $1M-$10M
- Gaoa Zarembo Island Boat Launch, Road Reconstruction, Aops & St Johns Bridge- St Johns Bridge Replacement- Replace A 80'completed
· $1M-$10M
- Glba/297831Ab-Rehab Depot To Consolidate Recycling And Property Operations Systemcompleted
· $1M-$10M
- Igf::Ot::Igf - The Alaska Job Corps Center Was Constructed In 1993 And The Center Roofs Are Currently 21 Years Old. Ice completed
· $1M-$10M
- Inc New Yakutat Fh10 Aquatic Organism Passage- Base Item - Fh-10 Mp 21.426 & 21.454 Aop Construction Remove And Dispose completed
· $1M-$10M
- Jbr054 Camp Denali Modernization, Jber, Alaskacompleted
· $1M-$10M
- Mab Ups Replacementcompleted
· $1M-$10M
- Micro-Grid Improvement Project - Katmai National Parkunder construction
· $1M-$10M
- Naha Trail Reconstruction Phase 2- Base Items & Option 2 Itemcompleted
· $1M-$10M
- Renovate Building 9387 Olde Lounge By Updating All Architectural Finishes, Lighting, Flooring, Furniture, And Equipment.completed
· $1M-$10M
- Replace Fuel Tanks At Eagle Airstripcompleted
· $1M-$10M
- Sba # Sw1750716010G Firm-Fixed Price (Ffp) Construction For Health, Wellness And Resiliency Center (Hwrc) At Redstone Acompleted
· Under $1M
- The Contractor Shall Furnish All Design, Labor, Equipment, Supplies, Materials, Appliances, Transportation And Perform Acompleted
· Under $1M