Alaska · Division 21
Fire Suppression projects in Alaska · page 2
Sprinklers, ESFR, deluge, fire protection. Usually specified by the fire protection engineer. Counted across our 300 highest-priority scored Alaska projects, 89 need this division and 75 are still in planning or permitting.
As of 2026-11-03, 89 of the 300 highest-scored Alaska projects in the SpecIndex index need fire suppression, and 75 of those are still in planning or permitting.
Search the full index →Showing 51–89 of 89 · page 2 of 2
- View specs →INSTALL BACKUP GENERATOR FOR LAB EQUIP B986
JBER
- View specs →INSTALL DOOR IG OFFICES, BLDG 10480
JBER
- View specs →Install Vent Hood
JBER
- View specs →Install Water Fountains Multiple Buildings
JBER
- View specs →Interior Upgrades Joint Military Mall
JBER
- View specs →JBER Hangar 2 Repair
JBER
- View specs →Open-End roofing repairs Alaska
- View specs →Repair Dorm B2260
Eielson AFB
- View specs →Repair HVAC Systems Laundry Room B651
JBER
- View specs →Repair Replace Hangar Doors JBER
JBER
- View specs →Replace Boilers Bldg 804 & 806
JBER
- View specs →Replace HVAC EMCS Controls B4943 & B4945
AK-06
- View specs →SIMPLIFIED ACQUISITION OF BASE ENGINEER REQUIREMENTS (SABER)
Eielson AFB
- View specs →Thorne Bay Bunkhouse Window Replacement
Thorne Bay
- View specs →USCIS TI Construction - AFB
Anchorage
- View specs →W911KB23R0010-FTW459 REPAIR PP BARRACKS B3207, FORT WAINWRIGHT, ALASKA
Fort Wainwright
- View specs →Water Treatment and Humidifier Upgrade Project at FAA's Anchorage Air Route Traffic Control Center (ARTCC) in Anchorage,
Anchorage
- View specs →Cabin and Propane Maintenance JRD
Juneau
- View specs →FTW511 Soldier Performance Readiness Center and FTW515 Unaccompanied Enlisted Housing, Fort Wainwright, Alaskaplanning
Fort Wainwright
- View specs →Barrow Observatory Flooring Replacement
Barrow
- SSA Warehouse, JBLM, WAunder construction
Anchorage · $10M-$50M
- EAR081 Roof Repair, Eareckson Air Station, Shemya Island, Alaskaunder construction
Adak · $10M-$50M
- EIE488 Replace Generators at CHPPunder construction
Eielson AFB · $10M-$50M
- OLI002 Road Repairunder construction
Barrow · $10M-$50M
- View specs →SEADC Exhibit Lighting System
- W911KB 23R0029- FTW469 REPAIR BARRACKS B3718under construction
Fort Wainwright · $10M-$50M
- View specs →(FTG251) Maintenance Support Facility Ft Greely, AKplanning
Fort Greely
- View specs →JBER Chapel Flooring Replacement
JBER
- Project Description- The Purpose Of This Project Is To Replace The Existing Fuels Management And Laboratory Facility (B3under construction
· $10M-$50M
- View specs →Project Labor Agreement (PLA) Survey for the Construction of an Area Maintenance Support Activity (AMSA) and Vehicle Maiplanning
Anchorage
- View specs →Replacement of Conference Room, and Command Suite Windows.
Eielson AFB
- View specs →Synopsis for the Multiple Award Task Order Contract (MATOC) for Real Property Repair, Maintenance and Minor Constructionplanning
Fort Wainwright
- FTG255 MEB 2 Chiller Replacementunder construction
Fort Greely · $1M-$10M
- View specs →Repair Fire Pump Controllers, B1176, HEF Disposal
Eielson AFB
- Eielson Fuels Lab - Akcompleted
· $1M-$10M
- View specs →FTW516 Fort Wainwright Dining Facilityplanning
Fort Wainwright
- View specs →ACC003 Weapons Generation Complex and Northern Flightlineplanning
JBER
- View specs →Intent to Sole Source for X-Ray Vault Safety Remediationplanning
Eielson AFB
- View specs →Sidewalk and Stairs Replacement WFO Juneauplanning
Juneau