Alabama · Division 23
HVAC projects in Alabama · page 4
Heating, cooling, ventilation, chillers, VRF. Usually specified by the mechanical engineer. Counted across our 300 highest-priority scored Alabama projects, 252 need this division and 65 are still in planning or permitting.
As of 2026-11-03, 252 of the 300 highest-scored Alabama projects in the SpecIndex index need hvac, and 65 of those are still in planning or permitting.
Search the full index →Showing 151–200 of 252 · page 4 of 6
- This Requirement Is For A Performance-Based Acquisition For Asphalt Paving, Construction Of Horizontal Structures, Earthcompleted
· Under $1M
- This Requirement Is For A Performance-Based Acquisition For Asphalt Paving, Construction Of Horizontal Structures, Earthcompleted
· Under $1M
- Bldg 550 Replace Hvac And Remediate Mold Issuesunder construction
· $1M-$10M
- Construction Of Building 78 Dorm Renovation, Anniston, Alcompleted
· $1M-$10M
- Construct Security Building At The 117Th Air Refueling Wing - Project Number Brkr009063completed
· $1M-$10M
- Design Build For Three Chillers To Modernize The Chilled Water Plant At Frank M. Johnson Federal Courthouse Al0003 One Cunder construction
· $1M-$10M
- Drmo Fire Tank, Main&Pumps Anniston Army Depot Alcompleted
· $1M-$10M
- Maintenance And Repairs Of The Ttww Upland Disposal Areas In Sumter County, Mscompleted
· $1M-$10M
- Maintenance Dredging Of The Perdido Pass Navigation Channels, Orange Beach, Alabama.completed
· $1M-$10M
- Mobile Upland Disposal Areas.completed
· $1M-$10M
- Msfc Building 4651 Air Stripper.under construction
· $1M-$10M
- Project 521-19-108 - Renovate Main Kitchen Birmingham Vamcunder construction
· $1M-$10M
- Project Number: Fakz039172 Construction Of A New 10,000 Weapons Load Crew Trainingcompleted
· $10M-$50M
- Renovate Squad Operations Building 1050completed
· $1M-$10M
- Repair Pavement At Shell Army Heliport, Fort Rucker, Alunder construction
· $1M-$10M
- Repair Pavements And Modernize Parking Ramps And Pads, Fort Novosel, Alcompleted
· $1M-$10M
- Tank Repairs At Multiple Locations (Dan, Jvl, Mrb, Mnt, Tol, Yea)under construction
· $10M-$50M
- The Purpose Of This Procurement Is To Award Solicitation 80Msfc24Mac01 Base Bid And Additive Alternate 2 Only.For Electrunder construction
· $1M-$10M
- The Purpose Of This Task Order Is For Building 127 Lab Space Renovations At Anniston Army Depot, Al.completed
· $1M-$10M
- The Purpose Of This Task Order Is To Provide Thaad Magazine Renovations For Usg Anniston Army Depot, In Anniston, Alabamcompleted
· $1M-$10M
- The Purpose Of This Task Order Under This Project Consist Of Providing The Labor, Equipment And Materials To Perform Thecompleted
· $1M-$10M
- This Effort Establishes The Requirements For Services To Produce Crushed Concrete Suitable For Anniston Army Depot (Anadunder construction
· Under $1M
- This Is A Design Build Effort To Add An Addition To The Existing Shipping And Receiving Building At Fbi Redstone'S Northcompleted
· $10M-$50M
- 521-21-106 | Medical Gas Project Construction | Birmingham, Al Vamcunder construction
· $1M-$10M
- 619A4-21-101 Renovate Pathology, Building 4 Constructionunder construction
· $1M-$10M
- Al-Bon Secour Nwr-Replace Hdqtrs Officecompleted
· $1M-$10M
- Construct Atc Tower Hatch Stage Fieldcompleted
· $1M-$10M
- Construction Of A 3,800 Sq. Ft. Administrative Facility Located At Maxwell Air Force Base (Afb), Alcompleted
· $1M-$10M
- Construct Of A 4,700 Square Foot Engine Shop Facility Project Number Fakz199055completed
· $1M-$10M
- Cutterhead 18" Maintenance Dredging - Task Order For Alabama River Systemcompleted
· $1M-$10M
- Deployable Spare Parts Warehouse Vertical Construction Solicitationunder construction
Montgomery · $1M-$10M
- Design And Renovate The Existing First Floor Of Bldg. 4546 In Accordance W Ith Intelligence Community Directive And Intecompleted
· $1M-$10M
- Dhs Cobra Gen/Switchgr Replcompleted
· $1M-$10M
- Emergency Egress Lighting Compliance Upgrade. This Project Will Replace Msfc Emergency Lighting Systems Bringing Them Upunder construction
· $1M-$10M
- Engineer Research & Development (Smdc Rdt&E Lab)completed
· $1M-$10M
- View specs →FY 26 SOS HVAC Duct Cleaningplanning
Montgomery
- Idiq Paving Contract, Fort Novosel, Alcompleted
· $1M-$10M
- Maintenance Dredging, Hopper Dredge And Attendant Plant For Dredging In Alabama, Mississippi, And Floridacompleted
· $1M-$10M
- Maintenance Of The Gaillard Island Disposal Area Equipment Rentalcompleted
· $1M-$10M
- Minor Construction Task Orderunder construction
· Under $1M
- Minor Construction Task Order To Revitalize The Electrical System In Building 4583 Per Fwr R001108345 Ifb Package.under construction
· $1M-$10M
- View specs →N--HVAC Replacement NWS WFO in Mobile, AL
Mobile
- Project Title: Msfc Utility Control System Risk Reduction Phase 2under construction
· $1M-$10M
- Renovate Squad Operations Building 1054completed
· $1M-$10M
- Renovation And 3000 Sq Ft Addition To The Squadron Operation Building Located At The 187Fw.completed
· $1M-$10M
- Repair Bldg 50101 & Enlarge Truck Baycompleted
· $1M-$10M
- Replace Approach Light System And Runway Lights At Cairns Aaf, Fort Rucker, Alabamacompleted
· $1M-$10M
- Task Order For B433 Recapitalization Phase 2, Anad-Anniston, Alabamacompleted
· $1M-$10M
- The Contractor Shall Furnish The Equipment, Materials, Supplies, And Manpower Required To Perform Drainage And Maintenancompleted
· $1M-$10M
- The Purpose Of This Task Order Is For The Construction Of A Controls, Electronics, And Integration Laboratory At Redstoncompleted
· $1M-$10M