Alabama · Division 07
Thermal and Moisture Protection projects in Alabama · page 4
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored Alabama projects, 241 need this division and 62 are still in planning or permitting.
As of 2026-11-03, 241 of the 300 highest-scored Alabama projects in the SpecIndex index need thermal and moisture protection, and 62 of those are still in planning or permitting.
Search the full index →Showing 151–200 of 241 · page 4 of 5
- Maintenance Dredging Of The Perdido Pass Navigation Channels, Orange Beach, Alabama.completed
· $1M-$10M
- Mobile Upland Disposal Areas.completed
· $1M-$10M
- Msfc Building 4651 Air Stripper.under construction
· $1M-$10M
- Project 521-19-108 - Renovate Main Kitchen Birmingham Vamcunder construction
· $1M-$10M
- Project Number: Fakz039172 Construction Of A New 10,000 Weapons Load Crew Trainingcompleted
· $10M-$50M
- Renovate Squad Operations Building 1050completed
· $1M-$10M
- Repair Pavement At Shell Army Heliport, Fort Rucker, Alunder construction
· $1M-$10M
- Repair Pavements And Modernize Parking Ramps And Pads, Fort Novosel, Alcompleted
· $1M-$10M
- Tank Repairs At Multiple Locations (Dan, Jvl, Mrb, Mnt, Tol, Yea)under construction
· $10M-$50M
- The Purpose Of This Procurement Is To Award Solicitation 80Msfc24Mac01 Base Bid And Additive Alternate 2 Only.For Electrunder construction
· $1M-$10M
- The Purpose Of This Task Order Is To Provide Thaad Magazine Renovations For Usg Anniston Army Depot, In Anniston, Alabamcompleted
· $1M-$10M
- The Purpose Of This Task Order Under This Project Consist Of Providing The Labor, Equipment And Materials To Perform Thecompleted
· $1M-$10M
- This Effort Establishes The Requirements For Services To Produce Crushed Concrete Suitable For Anniston Army Depot (Anadunder construction
· Under $1M
- This Is A Design Build Effort To Add An Addition To The Existing Shipping And Receiving Building At Fbi Redstone'S Northcompleted
· $10M-$50M
- 619A4-21-101 Renovate Pathology, Building 4 Constructionunder construction
· $1M-$10M
- Al-Bon Secour Nwr-Replace Hdqtrs Officecompleted
· $1M-$10M
- Construct Atc Tower Hatch Stage Fieldcompleted
· $1M-$10M
- Construction Of A 3,800 Sq. Ft. Administrative Facility Located At Maxwell Air Force Base (Afb), Alcompleted
· $1M-$10M
- Construct Of A 4,700 Square Foot Engine Shop Facility Project Number Fakz199055completed
· $1M-$10M
- Cutterhead 18" Maintenance Dredging - Task Order For Alabama River Systemcompleted
· $1M-$10M
- Deployable Spare Parts Warehouse Vertical Construction Solicitationunder construction
Montgomery · $1M-$10M
- Design And Renovate The Existing First Floor Of Bldg. 4546 In Accordance W Ith Intelligence Community Directive And Intecompleted
· $1M-$10M
- Dhs Cobra Gen/Switchgr Replcompleted
· $1M-$10M
- Emergency Egress Lighting Compliance Upgrade. This Project Will Replace Msfc Emergency Lighting Systems Bringing Them Upunder construction
· $1M-$10M
- Engineer Research & Development (Smdc Rdt&E Lab)completed
· $1M-$10M
- View specs →FY 26 SOS HVAC Duct Cleaningplanning
Montgomery
- Idiq Paving Contract, Fort Novosel, Alcompleted
· $1M-$10M
- Maintenance Dredging, Hopper Dredge And Attendant Plant For Dredging In Alabama, Mississippi, And Floridacompleted
· $1M-$10M
- Maintenance Of The Gaillard Island Disposal Area Equipment Rentalcompleted
· $1M-$10M
- Minor Construction Task Orderunder construction
· Under $1M
- Minor Construction Task Order To Revitalize The Electrical System In Building 4583 Per Fwr R001108345 Ifb Package.under construction
· $1M-$10M
- View specs →N--HVAC Replacement NWS WFO in Mobile, AL
Mobile
- Project Title: Msfc Utility Control System Risk Reduction Phase 2under construction
· $1M-$10M
- Renovate Squad Operations Building 1054completed
· $1M-$10M
- Renovation And 3000 Sq Ft Addition To The Squadron Operation Building Located At The 187Fw.completed
· $1M-$10M
- Repair Bldg 50101 & Enlarge Truck Baycompleted
· $1M-$10M
- Replace Approach Light System And Runway Lights At Cairns Aaf, Fort Rucker, Alabamacompleted
· $1M-$10M
- Task Order For B433 Recapitalization Phase 2, Anad-Anniston, Alabamacompleted
· $1M-$10M
- The Contractor Shall Furnish The Equipment, Materials, Supplies, And Manpower Required To Perform Drainage And Maintenancompleted
· $1M-$10M
- The Purpose Of This Task Order Is For The Renovation Of Building 1406, Maxwell Afb, Alcompleted
· $1M-$10M
- The Purpose Of This Task Order Is To Construct Usda-Ars Auburn Storage Building At Auburn, Al.completed
· $1M-$10M
- The Purpose Of This Task Order Is To Design And Construct A Restricted Water Distribution System Repairs At Anniston Armcompleted
· $1M-$10M
- The Purpose Of This Task Order Is To Design And Construct A Water Distribution System Repairs At Anniston Army Depot, Alunder construction
· $1M-$10M
- The Purpose Of This Task Order Is To Design And Construct Water Distribution System Repairs For A Restricted Area At Anncompleted
· $1M-$10M
- This Is An 8(A) Sole Source C Type Contract For Dla Storage Drainage Fields, Anniston Army Depot, Anniston, Alabama.completed
· $1M-$10M
- This Project Replaces And Updates Msfc Utility Control System (Ucs), Which Supports Site-Wide Capabilities And Operationunder construction
· $1M-$10M
- Type K - Repair Workcompleted
· $1M-$10M
- Vertical Construction Of A 6,000 Square Foot Deployable Spare Parts Warehouse.under construction
· $1M-$10M
- W9127824R0074 Sewer Repairs, Anniston Army Depot, Anniston, Alcompleted
· $1M-$10M
- 679-19-103 Correct Critical Infrastructure Bldg. 4completed
· $1M-$10M