Arizona · Division 03
Concrete projects in Arizona
Cast in place, precast, tilt-up. Usually specified by the structural engineer. Counted across our 300 highest-priority scored Arizona projects, 40 need this division and 3 are still in planning or permitting.
As of 2026-11-03, 40 of the 300 highest-scored Arizona projects in the SpecIndex index need concrete, and 3 of those are still in planning or permitting.
Search the full index →- Design Build And Construct New Checkpoint Facility At Wellton, Azunder construction
· $50M-$100M
- Design-Build And Construct New Checkpoint Facility Located At Nogales, Az.under construction
· $50M-$100M
- View specs →127EAX24R0018 – Green Base Work Center Office Replacement
Williams
- Design-Build Services For The Raul Hector Castro Land Port Of Entry In Douglas, Azunder construction
· $100M+
- Upgrade The Emergency Electrical System With A Second Generator And Increased Fuel Capacity. Modify The Docks And Compacunder construction
· $1M-$10M
- Gibbs Wash Bridge Replacement, Coronado National Forest.under construction
· $1M-$10M
- Grand Canyon National Park- Design/Build Rehabilitation Of Black (Kaibab) Bridge -Utilizing The Fws Design/Build Idiq Maunder construction
· $1M-$10M
- Grca 318719 Construct Temp. Wwtp At Nortunder construction
· $10M-$50M
- Boiler Replacement Effort At Deconcini Usch, Tucson Azunder construction
· $1M-$10M
- View specs →Construct 42 Miles Primary Barrier, Fy20 284 Tucson Project 3completed
· $100M+
- View specs →Construction 29 Mi Primary Barriercompleted
· $100M+
- Construction Project To Bring Two Nps Log Cabins, Located At The Dellenbaugh Admin Site At Grand Canyon-Parashant Nationunder construction
· Under $1M
- View specs →Design Build Of Tucson Sector Barrier Wall Replacement Project, Various Locations, Azcompleted
· $100M+
- View specs →Undefinitized Contract Action For El Centro (15 Mile) In California And Yuma (5 Mile) In Arizona.completed
· $100M+
- View specs →Y1GZ--Construct Replacement Warehouse Prescott VAMC (Minor Construction)
Prescott
- Border Wall Construction For Tca-5 Ton.under construction
· $100M+
- Design Build Construction Effort To Modify Existing Space To Add 3 Interview Rooms And Secure Hallway At John Roll Ch, Yunder construction
· Under $1M
- Effort To Complete The Secondary Chilled Water Piping Modification At James Walsh Ch In Tucson Azunder construction
· $1M-$10M
- Eo 14398 Davis Dam Sewer Evaporation Pond Relining - Task Orderunder construction
· Under $1M
- Grca 352119 Critical Utilities Restorationunder construction
· $1M-$10M
- Repairs To Phoenix Rearing Facility Plumbing Systemunder construction
· $1M-$10M
- Az Np Grca 14(2) Roadway Improvements Guardrail And Paving Improvementsunder construction
· $1M-$10M
- Winslow, Az - (Inw) Rcag Tower Replacement In Winslow, Az In Accordance With The Sow And Drawings.under construction
· $1M-$10M
- Asphalt Replacement Project At The Deconcini Usch Tucson Azunder construction
· Under $1M
- To Repair And/Or Reinforce A Section Of Gabion Retaining Wall At Mariposa Lpoe Nogales Azunder construction
· Under $1M
- To Replace Cracked Sewer Pipes At The Sandra Day O'Connor Courthouse, 401 W Washington St. Phoenix Az. 85003.under construction
· Under $1M
- Lake - Extend Ramp At Pearce Ferryunder construction
· $1M-$10M
- Tucson Cmop Door Replacementunder construction
· Under $1M
- View specs →Y--Partners Point Building and Boat Ramp Replacements
Lake Havasu City
- B5607 Storage And Wheel And Tire Shopunder construction
· $1M-$10M
- Ehrm Infrastructure Upgradesunder construction
· $1M-$10M
- Sucr 333890 Address Contaminated Debris, Replace Maintenance Storage Facility, And Address Road Drainage Issuesunder construction
· $1M-$10M
- The Purpose Of This Acquisition Is For The Routine Roofing Replacements And Repairs For Multiple Buildings At Fort Rileyunder construction
· $1M-$10M
- 0301 Gaoa Black Jack Campground Renovation, Apache-Sitgreaves National Forestunder construction
· $1M-$10M
- B4710 - Convert Cv22 Afe Backshop Storage Supplyunder construction
· $1M-$10M
- Lone Mountain Material Source Site Development & Stockpilingunder construction
· Under $1M
- This Project Is To Recarpet The F Floors At The Evo Courthouse In Tucson Az.under construction
· Under $1M
- Trailer Pad Utility Upgrades And Improvements For The North Kaibab And Tusayan Ranger Districts.under construction
· Under $1M
- Valencia Airport Centerunder construction
Tucson · $10M-$50M
- Yum-2 Vertical Border And Waterborne Barrier Constructionunder construction
· $100M+