DC · Division 09
Finishes projects in DC · page 2
Flooring, ceilings, drywall, paint, casework. Usually specified by the architect or interior designer. Counted across our 300 highest-priority scored DC projects, 108 need this division and 89 are still in planning or permitting.
As of 2026-11-03, 108 of the 300 highest-scored DC projects in the SpecIndex index need finishes, and 89 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 108 · page 2 of 3
- Joint Base Anacostia-Bolling (Jbab), Building 3623 Dormitory Renovationunder construction
· $10M-$50M
- View specs →Bridge_Regional Roofing JOCplanning
Washington Navy Yard
- View specs →CAFC Dolley Madison Exterior Painting - Amendment 1 & QA1
Washington
- Construction Of A New Bachelor Enlisted Quarters And Support Facility: A Multi-Rise, Mixed-Use Steel Frame, Brick-Clad Iunder construction
· $50M-$100M
- Energy Savings Performance Contract (Headquarters Building)under construction
· $50M-$100M
- View specs →Exterior Porches, Roofs and Stairs (3) Replacement
Washington
- View specs →GSA PBS Large Construction IDIQplanning
Washington
- View specs →Main Treasury Soffit Painting
Washington
- View specs →MSPB-HVAC-refresh-for-Computer-server- room
- View specs →Climate Control System Installation
Washington
- View specs →Construction of Glass Booths
- View specs →DCF NS-LEPE Site Preparationplanning
Washington
- View specs →EHRM Infrastructure Upgrades Construction - Washington, DC - Proj. 688-22-700planning
- View specs →HVAC Maintenance
Washington
- View specs →Main Treasury Demo Build Out 2453
- View specs →Metal Stairs Fabrication and Installation
Washington
- Nrl 74/81 Repair Solid State Electronic Devices Laboratory, Naval Research Laboratory, Washington D.C.under construction
· $10M-$50M
- Renovate Building 8 Marine Barracks Washington, Washington, Dccompleted
· $10M-$50M
- Base Bid Price For The For The Renovation Work Includes Services To Construct A Clean Room Laboratory And Incidental Relcompleted
· $10M-$50M
- View specs →Chiller Phase 1 - HVAC Riser Survey
Washington
- View specs →Conservatory Doors Preventive Maintenance & Repair Services
Washington
- View specs →CRAC Vault 4/5 Main Treasury
Washington
- View specs →CRAC Vault 9 Main Treasury
Washington
- View specs →Department of Treasury 5th Floor Renovation
Washington
- View specs →FLOOR COATING APPLICATION
Washington
- View specs →Main Treasury Renovation 1125
Washington
- Milcon P2203, Quarters 6 Whole House Revitalization Marine Barracks Washington, Dcunder construction
· $10M-$50M
- View specs →N0017326Q5317- Roof Membrane Replacement and Waterproofing
Washington
- View specs →NETWORK CABLING INSTALLATION
Washington
- View specs →RFP FOR INSTALLATIONS SERVICES
Washington
- View specs →SES and IG Suite Furniture Glass Tabletops
Washington
- ADDITION ALTERATION REPAIRpermitting
WASHINGTON · $1M-$10M
- View specs →Audio System Modernization
Washington
- View specs →Glazier Services BPA - Nationwide
Washington
- View specs →Indefinite Delivery Indefinite Quantity (IDIQ) contract for Elevator, Escalator, and Accessible Lifts Maintenance, Repai
Washington
- View specs →Intent to Sole Source: Absolute RSD - Office Space Renovationplanning
Washington
- Jbmhh Army Family Housing Fy21completed
· $1M-$10M
- View specs →Justification and Approval for Other Than Full and Open Competition R9 Construction IDIQ Bridge Extensionplanning
- Multiple Award Task Order Contract For Electrical Updates At The Naval Research Laboratory In Washington, Dccompleted
· $10M-$50M
- Project 688-Csi-013 Cardiac Cath Lab Replacement Room 4A124 At The Washington Dc Vamcunder construction
· $1M-$10M
- Vaco Turnstiles Project At Vaco Headquarters, 810 Vermont Ave Nw, Washington, D.C. 20420under construction
· Under $1M
- View specs →Modernization and Space Enhancement Services in the Frances Perkins Building (FPB)
- View specs →Modular Mobile Office and Acoustic Workspace Systemsplanning
- The Purpose Of This Contract Is To Provide All Management, Labor, Materials, Equipment, Transportation, To Provide All Dunder construction
· $1M-$10M
- View specs →Torit Dust Extraction System Service and Maintenance for the NMUSN
- View specs →USHMM Construction IDIQ
Washington
- ALTERATION AND REPAIRpermitting
WASHINGTON · $1M-$10M
- View specs →DCF AHU Coils
Washington
- View specs →Justification and Approval for Other Than Full and Open Competition National Complex Construction MATOC Period of Perforplanning
Washington
- Ocio'S Fy 24 Phase Three Data Center Demolition Construction Projectcompleted
· $1M-$10M