DC · Division 07
Thermal and Moisture Protection projects in DC · page 2
Roofing, insulation, EIFS, cladding, waterproofing. Usually specified by the architect or roofing consultant. Counted across our 300 highest-priority scored DC projects, 295 need this division and 90 are still in planning or permitting.
As of 2026-11-03, 295 of the 300 highest-scored DC projects in the SpecIndex index need thermal and moisture protection, and 90 of those are still in planning or permitting.
Search the full index →Showing 51–100 of 295 · page 2 of 6
- View specs →DOT HQ Replacement Moveable Bollards
Washington
- View specs →GPO Building B Garage Roof and Skylight Replacement
Washington
- Mbw-B25 Fan Coil Units Replacementunder construction
· $1M-$10M
- Multiple-Award Task Order Contracts (Matoc) For Alt/Repair Construction Services For The Continental Us And Hawaii In Anunder construction
· $1M-$10M
- 5Th & 7Th Floor Renovation Project At Theodore Roosevelt Building Dc0082Zzunder construction
· $1M-$10M
- Contract To Provide Full Approved Design And Complete Installation To Secure Vestibule Area Of Occupied Space.under construction
· Under $1M
- Trb Restroom Renovation And Workstation Powering Project - Design-Build Dc0082Zzunder construction
· $1M-$10M
- View specs →AFRH Mechanical Yard Enclosure
Washington
- View specs →AOC MACC Onboarding
Washington
- View specs →Architect of the Capitol Job Order Contract (JOC)
Washington
- View specs →Architect of the Capitol - Multiple Award Construction Contract (MACC)
Washington
- View specs →BUILDING 209 REPLACE LEAKING TRANSFORMERS T-148 AND T-149 AND SWITCHGEAR, NAVAL RESEARCH LABORTORY (NRL) WASHINGTON, D.C
Washington
- View specs →Construction Management Services IDIQ
Washington
- View specs →DESIGN BID BUILD NAVAL RESEARCH LABORATORY COMPOUND SEMICONDUCTOR PRODUCTION FACILITY RENOVATION, WASHINGTON, DC
Washington
- View specs →DOC A Phase 2D Tenant Build Out, St Elizabeths West Campus, SE Wash., DC
Washington
- Igf::Ot::Igf Pre-Construction Services, National Air&Space Museum Revitalizationcompleted
· $100M+
- View specs →Interior Renovation of Suite 1170, Building 391, JBAB, DC
WASHINGTON
- Ira: Provide Labor, Materials, Supervision, And Equipment To Construct The New Cisa Hq Building. Services Include, But Aunder construction
· $100M+
- View specs →Joint Base Myer-Henderson Hall: Army Family Housing Renovation Project, Fort McNair, Washington, D.C
Fort McNair
- View specs →Mechanical Enclosure Install/Wall Repairplanning
Washington
- View specs →NMIC-1 Refurbish Room 3A104, 2C120, and 2B100
Washington
- View specs →RFP FN1626-26 UNICOR PALLET RACKING INSTALLS
- View specs →SELECTIVE REPLACEMENTS – BUILDING 1, 4B WINDOWS
Washington
- View specs →Y1DA--Project 688-CSI-013 Cardiac Cath Lab Replacement Room 4A124 at the Washington DC VAMC.
Washington
- View specs →Y1DA--RENOVATE BIOMEDICAL ENGINEERING GC105 AT THE WASHINGTON DC VAMC
Washington
- View specs →Conference Room Renovations at the Frances Perkins Buildingunder construction
Washington
- Construction Manager As Constructor (Cmc) Services For The Modernization Of The Herbert C Hoover Building, Washington, Dcompleted
· $100M+
- Wny 111- Pcos 07 Leak 2 Repair, 08 Steel Channel Reinforcement, 10 Time And Cost Extension,11 Unforeseen Existing Conditunder construction
· Under $1M
- Igf::Ot::Igf P275 Electronic Science And Technology Lab, Nrl, Washington, Dccompleted
· $100M+
- Joint Base Anacostia-Bolling (Jbab), Building 3623 Dormitory Renovationunder construction
· $10M-$50M
- View specs →Bridge_Regional Roofing JOCplanning
Washington Navy Yard
- View specs →CAFC Dolley Madison Exterior Painting - Amendment 1 & QA1
Washington
- Construction Of A New Bachelor Enlisted Quarters And Support Facility: A Multi-Rise, Mixed-Use Steel Frame, Brick-Clad Iunder construction
· $50M-$100M
- Energy Savings Performance Contract (Headquarters Building)under construction
· $50M-$100M
- Eo 14398 - Flagpole Replacements At Fort Washington Park (Fowa) And Fort Mchenry National Monument And Historic Shrine (under construction
· Under $1M
- View specs →Exterior Porches, Roofs and Stairs (3) Replacement
Washington
- View specs →GSA PBS Large Construction IDIQplanning
Washington
- Igf::Ot::Igf Design-Build Of Central Utility Plant Expansion (Cup2), St Elizabeths West Campus, Se, Wash., Dccompleted
· $50M-$100M
- View specs →Main Treasury Soffit Painting
Washington
- Mbw - B20 And B9 Elevator Improvementsunder construction
· $1M-$10M
- View specs →MSPB-HVAC-refresh-for-Computer-server- room
- National Defense University (Ndu) Bldg 59 Hvac Upgradesunder construction
· $50M-$100M
- Project 688-25-104 Sterile Processing Services Deficiencies Correction Construction At The Washington Dc Vamc.under construction
· $1M-$10M
- Work Area 9.3 Construction Servicescompleted
· $50M-$100M
- Booth, Gates, And Secure Parking, United States Naval Observatory, Washington Dcunder construction
· $10M-$50M
- View specs →Climate Control System Installation
Washington
- View specs →Construction of Glass Booths
- View specs →DCF NS-LEPE Site Preparationplanning
Washington
- View specs →EHRM Infrastructure Upgrades Construction - Washington, DC - Proj. 688-22-700planning
- View specs →HVAC Maintenance
Washington